<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki.opensourceecology.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Jaqm</id>
	<title>Open Source Ecology - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://wiki.opensourceecology.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Jaqm"/>
	<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/wiki/Special:Contributions/Jaqm"/>
	<updated>2026-04-22T21:12:48Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.39.13</generator>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123211</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123211"/>
		<updated>2014-09-08T05:48:10Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* Miscellaneous */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=CEB Press firmware=&lt;br /&gt;
==2014-08-26/09-03==&lt;br /&gt;
===CEB Press firmware===&lt;br /&gt;
  * Troubleshooting the CEB Press power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
  * Firsts days testing the new code on the CEB Press test machine.&lt;br /&gt;
  * Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * Last CEB Press firmware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
===Power Cube===&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
&lt;br /&gt;
===Miscellaneous===&lt;br /&gt;
  * Configured the [[Octoprint_at_Factor_eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
  * The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
=Power Cube building=&lt;br /&gt;
==2014-08-18/25==&lt;br /&gt;
===Power Cube===&lt;br /&gt;
  * Assemblying the Power Cube.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Taken, filtered and uploaded a bunch of pictures to trovebox for powercube documentation.&lt;br /&gt;
===CEB Press===&lt;br /&gt;
  * Fixed the brick press production machine.&lt;br /&gt;
  * Assemblying and Fixing the brick press test machine.&lt;br /&gt;
  * Fixed the test controller board.&lt;br /&gt;
    - There was another pin that wasn&#039;t working.&lt;br /&gt;
    - The teensy and the fuse are broken.&lt;br /&gt;
    - Order a new Teensy for the Brick Press.&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
===3d Printing===&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self maintenance and improvement.&lt;br /&gt;
&lt;br /&gt;
===Aluminum===&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
&lt;br /&gt;
===Miscellaneous===&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
  * Taking pictures of the Composting toilet stairs building process.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Devin&#039;s melting aluminum masterclass.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=Post-MicroHouse Workshop=&lt;br /&gt;
==2014-08-15/16=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
==2014-08-08/12==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation II=&lt;br /&gt;
==2014-08-04/07==&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123188</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123188"/>
		<updated>2014-09-07T11:18:32Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=CEB Press firmware=&lt;br /&gt;
==2014-08-26/09-03==&lt;br /&gt;
===CEB Press firmware===&lt;br /&gt;
  * Troubleshooting the CEB Press power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
  * Firsts days testing the new code on the CEB Press test machine.&lt;br /&gt;
  * Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * Last CEB Press firmware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
===Power Cube===&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
&lt;br /&gt;
===Miscellaneous===&lt;br /&gt;
  * Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
  * The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
=Power Cube building=&lt;br /&gt;
==2014-08-18/25==&lt;br /&gt;
===Power Cube===&lt;br /&gt;
  * Assemblying the Power Cube.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Taken, filtered and uploaded a bunch of pictures to trovebox for powercube documentation.&lt;br /&gt;
===CEB Press===&lt;br /&gt;
  * Fixed the brick press production machine.&lt;br /&gt;
  * Assemblying and Fixing the brick press test machine.&lt;br /&gt;
  * Fixed the test controller board.&lt;br /&gt;
    - There was another pin that wasn&#039;t working.&lt;br /&gt;
    - The teensy and the fuse are broken.&lt;br /&gt;
    - Order a new Teensy for the Brick Press.&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
===3d Printing===&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self maintenance and improvement.&lt;br /&gt;
&lt;br /&gt;
===Aluminum===&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
&lt;br /&gt;
===Miscellaneous===&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
  * Taking pictures of the Composting toilet stairs building process.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Devin&#039;s melting aluminum masterclass.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=Post-MicroHouse Workshop=&lt;br /&gt;
==2014-08-15/16=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
==2014-08-08/12==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation II=&lt;br /&gt;
==2014-08-04/07==&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123187</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123187"/>
		<updated>2014-09-07T11:04:32Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
=Power Cube building=&lt;br /&gt;
==2014-08-18/25==&lt;br /&gt;
===Power Cube===&lt;br /&gt;
  * Assemblying the Power Cube.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Taken, filtered and uploaded a bunch of pictures to trovebox for powercube documentation.&lt;br /&gt;
===CEB Press===&lt;br /&gt;
  * Fixed the brick press production machine.&lt;br /&gt;
  * Assemblying and Fixing the brick press test machine.&lt;br /&gt;
  * Fixed the test controller board.&lt;br /&gt;
    - There was another pin that wasn&#039;t working.&lt;br /&gt;
    - The teensy and the fuse are broken.&lt;br /&gt;
    - Order a new Teensy for the Brick Press.&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
===3d Printing===&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self maintenance and improvement.&lt;br /&gt;
&lt;br /&gt;
===Aluminum===&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
&lt;br /&gt;
===Miscellaneous===&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
  * Taking pictures of the Composting toilet stairs building process.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Devin&#039;s melting aluminum masterclass.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=Post-MicroHouse Workshop=&lt;br /&gt;
==2014-08-15/16=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
==2014-08-08/12==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation II=&lt;br /&gt;
==2014-08-04/07==&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123186</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123186"/>
		<updated>2014-09-07T10:44:15Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Devin&#039;s melting aluminum masterclass.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=Post-MicroHouse Workshop=&lt;br /&gt;
==2014-08-15/16=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
==2014-08-08/12==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation II=&lt;br /&gt;
==2014-08-04/07==&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123185</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123185"/>
		<updated>2014-09-07T10:23:43Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
==2014-08-08/12==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation II=&lt;br /&gt;
==2014-08-04/07==&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123184</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123184"/>
		<updated>2014-09-07T10:21:57Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* Microhouse Workshop */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-08/10==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation II=&lt;br /&gt;
==2014-08-04/07==&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123183</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123183"/>
		<updated>2014-09-07T10:20:32Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* 2014-08-04/07: Microhouse 3 workshop preparation II */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation II=&lt;br /&gt;
==2014-08-04/07==&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123182</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123182"/>
		<updated>2014-09-07T10:18:49Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-04/07: Microhouse 3 workshop preparation II=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing line.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and plywood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123181</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123181"/>
		<updated>2014-09-07T10:15:03Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* Microhouse 3 workshop preparation */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation I=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123180</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123180"/>
		<updated>2014-09-07T10:14:23Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* 2014-08-01/03 */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123140</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123140"/>
		<updated>2014-09-06T19:49:50Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* Velocar Workshop */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01/03==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123139</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123139"/>
		<updated>2014-09-06T19:09:52Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=Microhouse 3 workshop preparation=&lt;br /&gt;
&lt;br /&gt;
==2014-07-22/31==&lt;br /&gt;
 * CEB Press:&lt;br /&gt;
  - Seeting up the testing CEB Press.&lt;br /&gt;
  - Pressing some bricks in the production Brick press.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  - CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
  - Decide to fork and rewrite the current firmware development for the CEB Press.&lt;br /&gt;
    &#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
 * Swimming Pool:&lt;br /&gt;
  - Fixing the licks of the pool.&lt;br /&gt;
 * Microhouse 3 workshop preparation:&lt;br /&gt;
  - Cutting wood and wires.&lt;br /&gt;
  - Helping to move rebar.&lt;br /&gt;
  - Moving soil.&lt;br /&gt;
  - Handling and measuring rebar.&lt;br /&gt;
  - Bending rebar.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
  - Publicity team.&lt;br /&gt;
  - Handling steel bars.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123138</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123138"/>
		<updated>2014-09-06T16:28:06Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* 2014-07-19 */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the Aidan&#039;s firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123137</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123137"/>
		<updated>2014-09-06T16:26:48Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* 2014-07-18 */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: First visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123136</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123136"/>
		<updated>2014-09-06T16:19:22Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123135</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123135"/>
		<updated>2014-09-06T16:17:53Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]] and [[Power_Cube_Troubleshooting_Instructions]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123134</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123134"/>
		<updated>2014-09-06T16:05:14Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* 2014-09-01 Monday */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes using the [[Power_Cube_Failure_Modes_and_Troubleshooting]].&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Octoprint_at_Factor_eFarm&amp;diff=123034</id>
		<title>Octoprint at Factor eFarm</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Octoprint_at_Factor_eFarm&amp;diff=123034"/>
		<updated>2014-09-04T01:50:28Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: Created page with &amp;quot;Octoprint is a web interface for 3D printers.  The RaspberryPi at FactoreFarm is running Octoprint and you can reach it just through the next url: http://$raspberrypiIp:50...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Octoprint is a web interface for 3D printers.&lt;br /&gt;
&lt;br /&gt;
The [[RaspberryPi at FactoreFarm]] is running Octoprint and you can reach it just through the next url: http://$raspberrypiIp:5000&lt;br /&gt;
&lt;br /&gt;
Replace $raspberrypiIp with the ip of the [[RaspberryPi at FactoreFarm]].&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=RaspberryPi_at_FactoreFarm&amp;diff=123033</id>
		<title>RaspberryPi at FactoreFarm</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=RaspberryPi_at_FactoreFarm&amp;diff=123033"/>
		<updated>2014-09-04T01:47:20Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: Created page with &amp;quot;At Factor eFarm we have a Raspberry Pi which connects on startup to the &amp;quot;wireless&amp;quot; network at Hablab, and gets automatically the ip: 192.168.1.142 .  This Raspberry Pi is now ...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;At Factor eFarm we have a Raspberry Pi which connects on startup to the &amp;quot;wireless&amp;quot; network at Hablab, and gets automatically the ip: 192.168.1.142 .&lt;br /&gt;
&lt;br /&gt;
This Raspberry Pi is now running the next services:&lt;br /&gt;
  - Infinoted, you can reach this service using [[Gobby-0.5]].&lt;br /&gt;
  - [[Octoprint at Factor eFarm]], a web interface for the working 3D printer.&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=How_to_configure_Gobby_at_Factor_eFarm&amp;diff=123032</id>
		<title>How to configure Gobby at Factor eFarm</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=How_to_configure_Gobby_at_Factor_eFarm&amp;diff=123032"/>
		<updated>2014-09-04T01:43:14Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Gobby is running in a local machine that is located at the Hablab.&lt;br /&gt;
&lt;br /&gt;
This service is working on [[RaspberryPi at FactoreFarm]].&lt;br /&gt;
&lt;br /&gt;
To access to this service you need to have installed in your computer [[Gobby-0.5]], run gobby-0.5 in your computer, click on &amp;quot;Direct Connection&amp;quot; and type the ip of the server: 192.168.1.121 , press enter and that&#039;s all.&lt;br /&gt;
&lt;br /&gt;
Hope you find it useful. Enjoy it!&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=How_to_configure_Gobby_at_Factor_eFarm&amp;diff=123031</id>
		<title>How to configure Gobby at Factor eFarm</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=How_to_configure_Gobby_at_Factor_eFarm&amp;diff=123031"/>
		<updated>2014-09-04T01:42:29Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Gobby is running in a local machine that is located at the Hablab.&lt;br /&gt;
&lt;br /&gt;
This machine is working on the &amp;quot;wireless&amp;quot; network with the ip: 192.168.1.142&lt;br /&gt;
&lt;br /&gt;
To access to this service you need to have installed in your computer [[Gobby-0.5]], run gobby-0.5 in your computer, click on &amp;quot;Direct Connection&amp;quot; and type the ip of the server: 192.168.1.121 , press enter and that&#039;s all.&lt;br /&gt;
&lt;br /&gt;
Hope you find it useful. Enjoy it!&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123030</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123030"/>
		<updated>2014-09-04T01:41:37Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press v6 test machine.&lt;br /&gt;
    - Configured the [[Octoprint at Facto eFarm]] in the RaspbeeryPi at FactoreFarm.&lt;br /&gt;
    - The Raspberry Pi is now connecting to the &amp;quot;wireless&amp;quot; network through the wireless interface.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes.&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123029</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=123029"/>
		<updated>2014-09-04T01:28:00Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Successful test of the new firmware on the CEB Press test machine.&lt;br /&gt;
    - &lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes.&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122996</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122996"/>
		<updated>2014-09-03T15:49:45Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-04 - Departure=&lt;br /&gt;
&lt;br /&gt;
=2014-09-03=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Minor changes in the code.&lt;br /&gt;
    - Writting documentation.&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  * https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
  * New CEB Press fimrware changelog:&lt;br /&gt;
    Changelog:&lt;br /&gt;
    - Removed the auto-calibration from test-mode.&lt;br /&gt;
    - Reimplemented the test mode.&lt;br /&gt;
    - The calibration is not being reseted in manual mode.&lt;br /&gt;
    - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour.&lt;br /&gt;
      A delay could happen depending on how long the solenoids take to actually start moving the cylinders.&lt;br /&gt;
    - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is  already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode.&lt;br /&gt;
    - auto-mode: goes into the failsafe stage if the solenoids haven&#039;t being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.&lt;br /&gt;
&lt;br /&gt;
[0] cylinder-bounce buttons: right and up buttons on test mode.&lt;br /&gt;
[1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  * Troubleshooting the power-cubes.&lt;br /&gt;
  * New test on the CEB Press tests machine.&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122896</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122896"/>
		<updated>2014-09-01T02:41:06Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-09-02 =&lt;br /&gt;
  *&lt;br /&gt;
&lt;br /&gt;
=2014-09-01 Monday=&lt;br /&gt;
  *&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
  * Simplifying the new CEB Press firmware. It&#039;s now ready for a new test. Improving the documentation within the code.&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
  * Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.&lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27=&lt;br /&gt;
  - The whole day: writing the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122834</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122834"/>
		<updated>2014-08-30T08:11:57Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* 2014-08-29 */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-08-28 Monday=&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-09-01=&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
  * Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
  * Repairing the CEB Press test machine solenoids.&lt;br /&gt;
  * Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
  * Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19 Tuesday=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17 Sunday=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16 Saturday=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15 Friday=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14 Thursday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13 Wednesday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12 Tuesday==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10 Sunday==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09 Saturday==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08 Friday==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07 Thursday=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06 Wednesday=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05 Tuesday=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03 Sunday==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02 Saturday==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01 Friday==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31 Thursday=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30 Wednesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29 Tuesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27 Sunday=&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26 Saturday=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25 Friday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24 Thursday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23 Wednesday=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22 Tuesday=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20 Sunday=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19 Saturday=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18 Friday=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17 - Thursday=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122833</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122833"/>
		<updated>2014-08-30T08:11:22Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-08-28 Monday=&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-09-01=&lt;br /&gt;
&lt;br /&gt;
=2014-08-31=&lt;br /&gt;
&lt;br /&gt;
=2014-08-30=&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
=2014-08-29=&lt;br /&gt;
* Assemblying the power cube v7 and taking pictures.&lt;br /&gt;
* Repairing the CEB Press test machine solenoids.&lt;br /&gt;
* Running the CEB Press, first day testing the new code on a real machine.&lt;br /&gt;
* Writing the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-28=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-27=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-26=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19 Tuesday=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17 Sunday=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16 Saturday=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15 Friday=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14 Thursday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13 Wednesday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12 Tuesday==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10 Sunday==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09 Saturday==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08 Friday==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07 Thursday=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06 Wednesday=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05 Tuesday=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03 Sunday==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02 Saturday==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01 Friday==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31 Thursday=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30 Wednesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29 Tuesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27 Sunday=&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26 Saturday=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25 Friday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24 Thursday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23 Wednesday=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22 Tuesday=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20 Sunday=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19 Saturday=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18 Friday=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17 - Thursday=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122795</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122795"/>
		<updated>2014-08-29T05:50:09Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* 2014-07-16 - Wednesday */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Thursday=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Wednesday=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24 Tuesday=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-23 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22 Sunday=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Saturday=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Friday=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Thursday=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Wednesday=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19 Tuesday=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17 Sunday=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16 Saturday=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15 Friday=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14 Thursday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13 Wednesday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12 Tuesday==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10 Sunday==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09 Saturday==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08 Friday==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07 Thursday=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06 Wednesday=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05 Tuesday=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03 Sunday==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02 Saturday==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01 Friday==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31 Thursday=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30 Wednesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29 Tuesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27 Sunday=&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26 Saturday=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25 Friday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24 Thursday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23 Wednesday=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22 Tuesday=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20 Sunday=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19 Saturday=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18 Friday=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17 - Thursday=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Arrival=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122794</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122794"/>
		<updated>2014-08-29T05:49:06Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&#039;&#039;&#039;Please post most recent entry on top&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Thursday=&lt;br /&gt;
  * Set up the CEB Press test machine. The solenoids are licking.&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Wednesday=&lt;br /&gt;
  * Moving lumber to a better place.&lt;br /&gt;
  * Helping in the Power Cube v7 documentation.&lt;br /&gt;
  * Preparing the CEB Press test controller board.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24 Tuesday=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-08-23 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22 Sunday=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Saturday=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Friday=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Thursday=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Wednesday=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19 Tuesday=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17 Sunday=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16 Saturday=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15 Friday=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14 Thursday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13 Wednesday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12 Tuesday==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
&lt;br /&gt;
==2014-08-10 Sunday==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09 Saturday==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-08 Friday==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07 Thursday=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-06 Wednesday=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05 Tuesday=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-03 Sunday==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02 Saturday==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-01 Friday==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31 Thursday=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30 Wednesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29 Tuesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27 Sunday=&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-26 Saturday=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25 Friday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-24 Thursday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23 Wednesday=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22 Tuesday=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20 Sunday=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19 Saturday=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-18 Friday=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-17 - Thursday=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
=2014-07-16 - Wednesday=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122640</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122640"/>
		<updated>2014-08-27T15:32:14Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=2014-07-16 - Wednesday=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
=2014-07-17 - Thursday=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-07-18 Friday=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19 Saturday=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20 Sunday=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22 Tuesday=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23 Wednesday=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-24 Thursday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25 Friday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-26 Saturday=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27 Sunday=&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29 Tuesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30 Wednesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31 Thursday=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
= Velocar Workshop=&lt;br /&gt;
==2014-08-01 Friday==&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
==2014-08-02 Saturday==&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
==2014-08-03 Sunday==&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05 Tuesday=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-06 Wednesday=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07 Thursday=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=Microhouse Workshop=&lt;br /&gt;
==2014-08-08 Friday==&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
==2014-08-09 Saturday==&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-10 Sunday==&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-11 Monday==&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
==2014-08-12 Tuesday==&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13 Wednesday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14 Thursday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15 Friday=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16 Saturday=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17 Sunday=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19 Tuesday=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Wednesday=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Thursday=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Friday=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Saturday=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22 Sunday=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24 Tuesday=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Wednesday=&lt;br /&gt;
  *&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122628</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122628"/>
		<updated>2014-08-27T03:35:57Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=2014-07-16 - Wednesday=&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
=2014-07-17 - Thursday=&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=2014-07-18 Friday=&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
=2014-07-19 Saturday=&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
=2014-07-20 Sunday=&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
=2014-07-21 Monday=&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
=2014-07-22 Tuesday=&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
=2014-07-23 Wednesday=&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
=2014-07-24 Thursday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-25 Friday=&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
=2014-07-26 Saturday=&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
=2014-07-27 Sunday=&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
=2014-07-28 Monday=&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
=2014-07-29 Tuesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
=2014-07-30 Wednesday=&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
=2014-07-31 Thursday=&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-01 Friday=&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-02 Saturday=&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
=2014-08-03 Sunday=&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
=2014-08-04 Monday=&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-05 Tuesday=&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
=2014-08-06 Wednesday=&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
=2014-08-07 Thursday=&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-08 Friday=&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
=2014-08-09 Saturday=&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
=2014-08-10 Sunday=&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
=2014-08-11 Monday=&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
=2014-08-12 Tuesday=&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
=2014-08-13 Wednesday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-14 Thursday=&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
=2014-08-15 Friday=&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
=2014-08-16 Saturday=&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
=2014-08-17 Sunday=&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
=2014-08-18 Monday=&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
=2014-08-19 Tuesday=&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Wednesday=&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
=2014-08-20 Thursday=&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Friday=&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
=2014-08-21 Saturday=&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
=2014-08-22 Sunday=&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
=2014-08-23 Monday=&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
=2014-08-24 Tuesday=&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
=2014-08-25 Wednesday=&lt;br /&gt;
  *&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122625</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122625"/>
		<updated>2014-08-27T02:17:37Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
2014-08-24 Tuesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm. Wrote the documentation related on this wiki.&lt;br /&gt;
&lt;br /&gt;
2014-08-25 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  *&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=How_to_configure_Gobby_at_Factor_eFarm&amp;diff=122624</id>
		<title>How to configure Gobby at Factor eFarm</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=How_to_configure_Gobby_at_Factor_eFarm&amp;diff=122624"/>
		<updated>2014-08-27T02:15:26Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: Created page with &amp;quot;Gobby is running in a local machine that is located at the Hablab.  This machine is working on the &amp;quot;wireless&amp;quot; network with the ip: 192.168.1.121  To access to this service you...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Gobby is running in a local machine that is located at the Hablab.&lt;br /&gt;
&lt;br /&gt;
This machine is working on the &amp;quot;wireless&amp;quot; network with the ip: 192.168.1.121&lt;br /&gt;
&lt;br /&gt;
To access to this service you need to have installed in your computer [[Gobby-0.5]], run gobby-0.5 in your computer, click on &amp;quot;Direct Connection&amp;quot; and type the ip of the server: 192.168.1.121 , press enter and that&#039;s all.&lt;br /&gt;
&lt;br /&gt;
Hope you find it useful. Enjoy it!&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Gobby-0.5&amp;diff=122623</id>
		<title>Gobby-0.5</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Gobby-0.5&amp;diff=122623"/>
		<updated>2014-08-27T02:09:34Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: Created page with &amp;quot;Gobby-0.5 is the client used to connect the infinoted-0.5 service.  Official web: http://gobby.0x539.de/  To install it in Debian systems and derivatives like Ubuntu and other...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Gobby-0.5 is the client used to connect the infinoted-0.5 service.&lt;br /&gt;
&lt;br /&gt;
Official web: http://gobby.0x539.de/&lt;br /&gt;
&lt;br /&gt;
To install it in Debian systems and derivatives like Ubuntu and others you only need to run the next command line:&lt;br /&gt;
&lt;br /&gt;
  # sudo aptitude install gobby-0.5&lt;br /&gt;
&lt;br /&gt;
If you are at Factor eFarm you can configure Gobby using the [[How to configure Gobby at Factor eFarm]].&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Infinoted&amp;diff=122622</id>
		<title>Infinoted</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Infinoted&amp;diff=122622"/>
		<updated>2014-08-27T02:04:36Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: Created page with &amp;quot;Infinoted is a service for collaborative plain text editor. It also provide chat functionality.  The client used to connect to this service is known as Gobby-0.5 .  Instal...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Infinoted is a service for collaborative plain text editor.&lt;br /&gt;
It also provide chat functionality.&lt;br /&gt;
&lt;br /&gt;
The client used to connect to this service is known as [[Gobby-0.5]] .&lt;br /&gt;
&lt;br /&gt;
Installation:&lt;br /&gt;
-------------&lt;br /&gt;
&lt;br /&gt;
To install this service we have run the next command in the Raspberry Pi, which has Raspbian Wheezy installed:&lt;br /&gt;
&lt;br /&gt;
  # sudo aptitude install infinoted-0.5&lt;br /&gt;
&lt;br /&gt;
And to make it work each time the Raspberry Pi boot I have added the next line to /etc/rc.local&lt;br /&gt;
&lt;br /&gt;
  sudo -u pi infinoted --security-policy=no-tls -d&lt;br /&gt;
&lt;br /&gt;
And that&#039;s all. Enjoy this new service!&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122621</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122621"/>
		<updated>2014-08-27T01:57:52Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
2014-08-24 Tuesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors and stepper drivers used in the torch table.&lt;br /&gt;
  * Set up [[Infinoted]] on the Raspberry Pi that is running on the Wireless network at Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
2014-08-25 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  *&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122603</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122603"/>
		<updated>2014-08-26T20:49:48Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;br /&gt;
&lt;br /&gt;
2014-08-24 Tuesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Making work the 3D Printer.&lt;br /&gt;
  * Studying the steppers motors used in the torch table.&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122602</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122602"/>
		<updated>2014-08-26T20:48:26Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Built a picnic table.&lt;br /&gt;
  * Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
  * Moving pallets and pieces of wood to cut.&lt;br /&gt;
  * Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
  * Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
  * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Mounting doms.&lt;br /&gt;
  * Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Carpintery: building modules for the Microhouse 3.&lt;br /&gt;
  * Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Assembling a structure to cover the microhouse.&lt;br /&gt;
  * Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Melting aluminum.&lt;br /&gt;
  * First test of the new firmware on the CEB Press.&lt;br /&gt;
  * Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
  * Cutting steel tubes.&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
  * Taking down a dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
  * Uploading the pictures I took yesterday.&lt;br /&gt;
  * Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
  * Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Cutting aluminum.&lt;br /&gt;
  * Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Moving some boards to the old workshop.&lt;br /&gt;
  * Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
  * Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
  * Fixing the Brick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Rainy day.&lt;br /&gt;
  * Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
  * Improving and fixing a bug in the new brick press code.&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
  * Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
  * Order a new Teensy for the Brick Press.&lt;br /&gt;
  * I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;br /&gt;
  * Assemblying the CEB Press testing machine.&lt;br /&gt;
  * Assemblying the Power Cube in progress.&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122600</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122600"/>
		<updated>2014-08-26T16:29:41Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
  - 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
  - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
  - 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
  - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
  - 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
  - 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
  - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
  - Brick press team. Moving the head of the machine.&lt;br /&gt;
  - Grinding and welding during the whole afternoon.&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Publicity team.&lt;br /&gt;
  - Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
  - Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
  - Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
  - Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
  - Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&#039;&#039;&#039;Git repository: https://github.com/jaqm/Open-CEB-Press&#039;&#039;&#039;&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
  - Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
  - The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
  - Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
  - Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - Review high pressure sensor flag support.&lt;br /&gt;
    - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
  * Cutting wood and wires for the MicroHouse.&lt;br /&gt;
  * Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
  * CEB Press firmware:&lt;br /&gt;
    - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
  * Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
  * Seeting up the testing CEB Press.&lt;br /&gt;
  * Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Assemblying the CEB Press testing machine.&lt;br /&gt;
* Assemblying the Power Cube in progress.&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122599</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122599"/>
		<updated>2014-08-26T15:59:21Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Assemblying the CEB Press testing machine.&lt;br /&gt;
* Assemblying the Power Cube in progress.&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122598</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122598"/>
		<updated>2014-08-26T15:57:39Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
  - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
  - 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
  - 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
  - 13:30: Lunch.&lt;br /&gt;
  - 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
  - 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
  - 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122596</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122596"/>
		<updated>2014-08-26T15:25:27Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
  - 19:00: Arrival to MCI airport.&lt;br /&gt;
  - 21:00: Arrival to Factor eFarm.&lt;br /&gt;
  - 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
&lt;br /&gt;
- 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:30: Lunch.&lt;br /&gt;
&lt;br /&gt;
- 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
&lt;br /&gt;
- 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
&lt;br /&gt;
- 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122595</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122595"/>
		<updated>2014-08-26T15:21:30Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
- 19:00: Arrival to MCI airport.&lt;br /&gt;
&lt;br /&gt;
- 21:00: Arrival to Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
- 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
&lt;br /&gt;
- 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:30: Lunch.&lt;br /&gt;
&lt;br /&gt;
- 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
&lt;br /&gt;
- 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
&lt;br /&gt;
- 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122594</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122594"/>
		<updated>2014-08-26T15:19:53Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
- 19:00: Arrival to MCI airport.&lt;br /&gt;
&lt;br /&gt;
- 21:00: Arrival to Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
- 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
&lt;br /&gt;
- 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:30: Lunch.&lt;br /&gt;
&lt;br /&gt;
- 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
&lt;br /&gt;
- 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
&lt;br /&gt;
- 19:20:&lt;br /&gt;
  - Adopting Trello for the DMAIC team.&lt;br /&gt;
&lt;br /&gt;
  - Analyzing the existing documentation platform.&lt;br /&gt;
&lt;br /&gt;
  - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122587</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122587"/>
		<updated>2014-08-25T16:57:33Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
- 19:00: Arrival to MCI airport.&lt;br /&gt;
&lt;br /&gt;
- 21:00: Arrival to Factor eFarm.&lt;br /&gt;
&lt;br /&gt;
- 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17 Thursday:&lt;br /&gt;
------------&lt;br /&gt;
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
&lt;br /&gt;
- 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
&lt;br /&gt;
- 13:30: Lunch.&lt;br /&gt;
&lt;br /&gt;
- 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
&lt;br /&gt;
- 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
&lt;br /&gt;
- 19:20: - Adopting Trello for the DMAIC team.&lt;br /&gt;
&lt;br /&gt;
  	 - Analyzing the existing documentation platform.&lt;br /&gt;
&lt;br /&gt;
	 - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122586</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122586"/>
		<updated>2014-08-25T16:56:03Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
- 19:00: Arrival to MCI airport.&lt;br /&gt;
&lt;br /&gt;
- 21:00: Arrival to Factor eFarm.&lt;br /&gt;
- 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17:&lt;br /&gt;
------------&lt;br /&gt;
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
- 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
- 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
- 13:30: Lunch.&lt;br /&gt;
- 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
- 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
- 19:20: - Adopting Trello for the DMAIC team.&lt;br /&gt;
  	 - Analyzing the existing documentation platform.&lt;br /&gt;
	 - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122570</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122570"/>
		<updated>2014-08-25T06:02:29Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
- 19:00: Arrival to MCI airport.&lt;br /&gt;
- 21:00: Arrival to Factor eFarm.&lt;br /&gt;
- 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17:&lt;br /&gt;
------------&lt;br /&gt;
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
- 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
- 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
- 13:30: Lunch.&lt;br /&gt;
- 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
- 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
- 19:20: - Adopting Trello for the DMAIC team.&lt;br /&gt;
  	 - Analyzing the existing documentation platform.&lt;br /&gt;
	 - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
Git repository: https://github.com/jaqm/Open-CEB-Press&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122569</id>
		<title>Jose Antonio log</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Jose_Antonio_log&amp;diff=122569"/>
		<updated>2014-08-25T05:33:17Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: Created page with &amp;quot;2014-07-16 (Wednesday): ----------------------- - 19:00: Arrival to MCI airport. - 21:00: Arrival to Factor eFarm. - 23:00: Sleep  2014-07-17: ------------ - 9:00: Group meeti...&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;2014-07-16 (Wednesday):&lt;br /&gt;
-----------------------&lt;br /&gt;
- 19:00: Arrival to MCI airport.&lt;br /&gt;
- 21:00: Arrival to Factor eFarm.&lt;br /&gt;
- 23:00: Sleep&lt;br /&gt;
&lt;br /&gt;
2014-07-17:&lt;br /&gt;
------------&lt;br /&gt;
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.&lt;br /&gt;
- 10:00: Teamwork to redesign the OSE documentation system.&lt;br /&gt;
- 13:00: Video record to show the progress on documentation system.&lt;br /&gt;
- 13:30: Lunch.&lt;br /&gt;
- 14:30: Back to work. Made a power converter EU -&amp;gt; US.&lt;br /&gt;
- 15:30: Continue with the redesign of the documentation and development system.&lt;br /&gt;
- 19:20: - Adopting Trello for the DMAIC team.&lt;br /&gt;
  	 - Analyzing the existing documentation platform.&lt;br /&gt;
	 - Setting up a infinoted test service, installing the gobby client, show it to the team.&lt;br /&gt;
&lt;br /&gt;
2014-07-18 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press.&lt;br /&gt;
- 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller.&lt;br /&gt;
- 17:30-18:00: Visit to the Workshop.&lt;br /&gt;
- 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor&#039;s piece.&lt;br /&gt;
&lt;br /&gt;
2014-07-19 Saturday:&lt;br /&gt;
--------------------&lt;br /&gt;
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press&#039; microcontroller code. &lt;br /&gt;
- 14:30-16:30: Coding the CEB Press microcontroller.&lt;br /&gt;
- 16:30-17:30: Helping out to take out some sand.&lt;br /&gt;
- 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller.&lt;br /&gt;
- &lt;br /&gt;
&lt;br /&gt;
2014-07-20 Sunday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Resting day.&lt;br /&gt;
&lt;br /&gt;
2014-07-21 Monday&lt;br /&gt;
--------------------&lt;br /&gt;
- Brick press team. Moving the head of the machine.&lt;br /&gt;
- Grinding and welding during the whole afternoon.&lt;br /&gt;
-&lt;br /&gt;
&lt;br /&gt;
2014-07-22 Tuesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Publicity team.&lt;br /&gt;
- Afternoon: Workshop, handling steel bars for the Microhouse 3.&lt;br /&gt;
&lt;br /&gt;
2014-07-23 Wednesday:&lt;br /&gt;
--------------------&lt;br /&gt;
- The whole day: bending bars for the Microhouse 3.&lt;br /&gt;
- Some welding practice.&lt;br /&gt;
&lt;br /&gt;
2014-07-24 Thursday:&lt;br /&gt;
--------------------&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3.&lt;br /&gt;
- Afternoon: Handling and measuring steel bars for the Microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-25 Friday:&lt;br /&gt;
- Morning: Moving soil for the Microhouse 3. &lt;br /&gt;
- Afternoon: Writting the next version for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-26 Saturday:&lt;br /&gt;
- Resting day: relax, pool, more relax, some time writting code, more relax.&lt;br /&gt;
&lt;br /&gt;
2014-07-27 Sunday:&lt;br /&gt;
- The whole day: writting the firmware for the CEB Press.&lt;br /&gt;
- Helping to move steel bars from the workshop to the microhouse.&lt;br /&gt;
&lt;br /&gt;
2014-07-28 Monday:&lt;br /&gt;
- Cleaning and reviewing the code for the CEB Press.&lt;br /&gt;
&lt;br /&gt;
2014-07-29 Tuesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - Review high pressure sensor flag support.&lt;br /&gt;
  - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.&lt;br /&gt;
* Cutting wood and wires for the MicroHouse.&lt;br /&gt;
* Dragging the pool to solve the licks.&lt;br /&gt;
&lt;br /&gt;
2014-07-30 Wednesday:&lt;br /&gt;
* CEB Press firmware:&lt;br /&gt;
  - going deep more into details of the auto-mode algorithm.&lt;br /&gt;
* Fixing the licks of the pool.&lt;br /&gt;
&lt;br /&gt;
2014-07-31 Thursday:&lt;br /&gt;
* Seeting up the testing CEB Press.&lt;br /&gt;
* Pressing some bricks in the production Brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-01 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Built a picnic table.&lt;br /&gt;
* Taking pictures of the Velocar workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-02 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Helping to print parts for the battery of the Velocar during the whole day and part of the evening.&lt;br /&gt;
&lt;br /&gt;
2014-08-03 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Baked some bread.&lt;br /&gt;
&lt;br /&gt;
2014-08-04 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Cleaning/organizing the buckets at the workshop.&lt;br /&gt;
* Moving pallets and pieces of wood to cut.&lt;br /&gt;
* Moving soil for the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-05 Tuesday:&lt;br /&gt;
-------------------&lt;br /&gt;
* Mounting the rollers for the Brick Pressing &amp;quot;Factory&amp;quot;.&lt;br /&gt;
* Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!&lt;br /&gt;
&lt;br /&gt;
2014-08-06 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting, pressing, drilling bars for the doms.&lt;br /&gt;
&lt;br /&gt;
2014-08-07 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Mounting doms.&lt;br /&gt;
* Preparing the Microhouse Workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-08 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Microhouse workshop starts.&lt;br /&gt;
&lt;br /&gt;
2014-08-09 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-10 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Carpintery: building modules.&lt;br /&gt;
* Pressing bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-11 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Laying bricks.&lt;br /&gt;
&lt;br /&gt;
2014-08-12 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Last day of the workshop.&lt;br /&gt;
&lt;br /&gt;
2014-08-13 Wednesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-14 Thursday:&lt;br /&gt;
------------------&lt;br /&gt;
* Day off.&lt;br /&gt;
&lt;br /&gt;
2014-08-15 Friday:&lt;br /&gt;
------------------&lt;br /&gt;
* Assembling a structure to cover the microhouse.&lt;br /&gt;
* Making work the pool pump.&lt;br /&gt;
&lt;br /&gt;
2014-08-16 Saturday:&lt;br /&gt;
------------------&lt;br /&gt;
* Group meeting.&lt;br /&gt;
&lt;br /&gt;
2014-08-17 Sunday:&lt;br /&gt;
------------------&lt;br /&gt;
* Melting alluminium.&lt;br /&gt;
* First test of the new firmware on the CEB Press.&lt;br /&gt;
* Adding new features and solving bugs on the new CEB Press firmware.&lt;br /&gt;
&lt;br /&gt;
2014-08-18 Monday:&lt;br /&gt;
------------------&lt;br /&gt;
* Tuning and solving bugs on the new CEB Press firmware.&lt;br /&gt;
* Cutting steel tubes.&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.&lt;br /&gt;
* Taking down the dom.&lt;br /&gt;
&lt;br /&gt;
2014-08-19 Tuesday:&lt;br /&gt;
------------------&lt;br /&gt;
* Uploading the pictures I took yesterday.&lt;br /&gt;
* Searching contact info of similar organizations to OSE to improve social networking.&lt;br /&gt;
* Replacing the saw of the bendsaw.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Wednesday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Cutting aluminum.&lt;br /&gt;
* Fixing the 3D-Printer, started to print little pieces for its self-improvement.&lt;br /&gt;
&lt;br /&gt;
2014-08-20 Thursday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Moving some boards to the old workshop.&lt;br /&gt;
* Filtering and uploading pictures to trovebox fo the powercube documentation.&lt;br /&gt;
* Found a Raspberry Pi. Set it up and now it&#039;s working on the &amp;quot;wireless&amp;quot; network.&lt;br /&gt;
* Fixing the Rbick Press. We didn&#039;t finished so we will tray again the next day if&#039;s possible.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Friday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Rainy day.&lt;br /&gt;
* Fixed the test controller board. There was another pin that wasn&#039;t working.&lt;br /&gt;
* Improving and fixing a bug in the new brick press code.&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
* Covering the microhouse to protect it against rain.&lt;br /&gt;
&lt;br /&gt;
2014-08-21 Saturday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press.&lt;br /&gt;
&lt;br /&gt;
2014-08-22 Sunday:&lt;br /&gt;
---------------------&lt;br /&gt;
* Fixing the brick press. The teensy and the fuse are broken.&lt;br /&gt;
* Order a new Teensy for the Brick Press.&lt;br /&gt;
* I finally publish the worklog.&lt;br /&gt;
&lt;br /&gt;
2014-08-23 Monday:&lt;br /&gt;
---------------------&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=Logs&amp;diff=122568</id>
		<title>Logs</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=Logs&amp;diff=122568"/>
		<updated>2014-08-25T05:29:52Z</updated>

		<summary type="html">&lt;p&gt;Jaqm: /* Current Work Logs */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;=Current Work Logs=&lt;br /&gt;
&lt;br /&gt;
*[[Marcin Log]]&lt;br /&gt;
*[[Aidan Log]]&lt;br /&gt;
*[[Ellena log]]&lt;br /&gt;
*[[Edo Log]]&lt;br /&gt;
*[[Curtis Log]]&lt;br /&gt;
*[[Eric Log]]&lt;br /&gt;
*[[Jim Log]]&lt;br /&gt;
*[[Michael Hess Log]]&lt;br /&gt;
*[[Victor Log]]&lt;br /&gt;
*[[Arif Log]]&lt;br /&gt;
*[[Moriah Log]]&lt;br /&gt;
*[[Greg Log]]&lt;br /&gt;
*[[Gabriel Kind log‎]]&lt;br /&gt;
*[[Cris Log]]&lt;br /&gt;
*[[Graham Coffman&#039;s log]]&lt;br /&gt;
*[[Stephen_Log]]&lt;br /&gt;
*[[Emily Log]]&lt;br /&gt;
*[[Molly log]]&lt;br /&gt;
*[[Danny K Log]]&lt;br /&gt;
*[[Anthony_douglas_log]]&lt;br /&gt;
*[[Chrisc log]]&lt;br /&gt;
*[[Sam Kiyomi Log]]&lt;br /&gt;
*[[Juan log]]&lt;br /&gt;
*[[Jasonshah_log]]&lt;br /&gt;
*[[Jeff Log]]&lt;br /&gt;
*[[Brenna log]]&lt;br /&gt;
*[[Clair Rose log]]&lt;br /&gt;
*[[Catarina Log]]&lt;br /&gt;
*[[Michael Pendergast Log]]&lt;br /&gt;
*[[Guillaume Log]]&lt;br /&gt;
*[[Charlie log]]&lt;br /&gt;
*[[Will Log]]&lt;br /&gt;
*[[Jose Antonio log]]&lt;br /&gt;
&lt;br /&gt;
==Remote==&lt;br /&gt;
*[[Yann Log]]&lt;br /&gt;
*[[Tom Log]]&lt;br /&gt;
*[[Rob Beddingfield Log]]&lt;br /&gt;
*[[Jean-Baptiste Log]]&lt;br /&gt;
*[[Monica Log]]&lt;br /&gt;
&lt;br /&gt;
=Spring breakers 2014=&lt;br /&gt;
*[[Chrisc log]] &lt;br /&gt;
*[[Colten Jackson Log]] &lt;br /&gt;
*[[Anthony douglas log]] &lt;br /&gt;
*[[Eric Potash Log]] &lt;br /&gt;
*[[Wes Log]] &lt;br /&gt;
*[[Laurynn log]] &lt;br /&gt;
*[[Catwilmes log]] &lt;br /&gt;
*[[Ben Lloyd Pearson Log]] &lt;br /&gt;
*[[Michael Seffren Log]] &lt;br /&gt;
*[[Andrew Graham Log]] &lt;br /&gt;
*[[Kyle log]]&lt;br /&gt;
&lt;br /&gt;
=2013 Logs=&lt;br /&gt;
*[[Samthetechie Log]]&lt;br /&gt;
*[[Jordan Log]]&lt;br /&gt;
*[[Scott Log]]&lt;br /&gt;
*[[Lucas Log]]&lt;br /&gt;
*[[Leandra Log]]&lt;br /&gt;
*[[Cory Log]]&lt;br /&gt;
*[[Justin Burnett Log]]&lt;br /&gt;
*[[Chris Reinhart Log]]&lt;br /&gt;
*[[Gary Log]]&lt;br /&gt;
*[[Audrey Log]]&lt;br /&gt;
*[[Lisa Log]]&lt;br /&gt;
*[[Husam Log]]&lt;br /&gt;
&lt;br /&gt;
==Other Logs==&lt;br /&gt;
*[[Rob_Beddingfield_Log]]&lt;br /&gt;
*[[Inverter Log]]&lt;br /&gt;
*[[Universal Rotor Log]]&lt;br /&gt;
*[[Accounting System Log]]&lt;br /&gt;
&lt;br /&gt;
==Links==&lt;br /&gt;
*[[Old Logs]]&lt;br /&gt;
*[http://opensourceecology.org/wiki/Category:Logs Category:Logs]&lt;br /&gt;
&lt;br /&gt;
[[Category:Logs]]&lt;/div&gt;</summary>
		<author><name>Jaqm</name></author>
	</entry>
</feed>