<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki.opensourceecology.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Seeker</id>
	<title>Open Source Ecology - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://wiki.opensourceecology.org/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Seeker"/>
	<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/wiki/Special:Contributions/Seeker"/>
	<updated>2026-04-23T17:57:01Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.39.13</generator>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft&amp;diff=321984</id>
		<title>SH7/Walls Templates SH7 Ext Wall 10 ft</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft&amp;diff=321984"/>
		<updated>2026-03-24T05:41:07Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_Templates_SH7 - Ext Wall - 10 ft - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~125&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 4 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_Templates_SH7 - Ext Wall - 10 ft&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft_Window_30&amp;diff=321983</id>
		<title>SH7/Walls Templates SH7 Ext Wall 10 ft Window 30</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft_Window_30&amp;diff=321983"/>
		<updated>2026-03-24T05:41:06Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_Templates_SH7 - Ext Wall - 10 ft - Window 30 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~125&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 5 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_Templates_SH7 - Ext Wall - 10 ft - Window 30&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft_Door_36&amp;diff=321982</id>
		<title>SH7/Walls Templates SH7 Ext Wall 10 ft Door 36</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft_Door_36&amp;diff=321982"/>
		<updated>2026-03-24T05:41:05Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_Templates_SH7 - Ext Wall - 10 ft - Door 36 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~125&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 3 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_Templates_SH7 - Ext Wall - 10 ft - Door 36&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft_Door_34&amp;diff=321981</id>
		<title>SH7/Walls Templates SH7 Ext Wall 10 ft Door 34</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_Templates_SH7_Ext_Wall_10_ft_Door_34&amp;diff=321981"/>
		<updated>2026-03-24T05:41:03Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_Templates_SH7 - Ext Wall - 10 ft - Door 34 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~114&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_Templates_SH7 - Ext Wall - 10 ft - Door 34&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_50&amp;diff=321980</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 50</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_50&amp;diff=321980"/>
		<updated>2026-03-24T05:41:02Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 50 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 7 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 50&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_49&amp;diff=321979</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 49</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_49&amp;diff=321979"/>
		<updated>2026-03-24T05:41:00Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 49 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 11&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 11&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 7 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 11&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$132 |&lt;br /&gt;
| PT Plywood | ~$220 |&lt;br /&gt;
| OSB | ~$110 |&lt;br /&gt;
| Insulation | ~$66 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$578** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 49&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_48&amp;diff=321978</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 48</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_48&amp;diff=321978"/>
		<updated>2026-03-24T05:40:59Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 48 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 12 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 48&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_47&amp;diff=321977</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 47</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_47&amp;diff=321977"/>
		<updated>2026-03-24T05:40:58Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 47 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 13 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 47&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_46&amp;diff=321976</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 46</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_46&amp;diff=321976"/>
		<updated>2026-03-24T05:40:57Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 46 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 46&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_45&amp;diff=321975</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 45</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_45&amp;diff=321975"/>
		<updated>2026-03-24T05:40:55Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 45 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 45&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_44&amp;diff=321974</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 44</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_44&amp;diff=321974"/>
		<updated>2026-03-24T05:40:54Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 44 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 44&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_43&amp;diff=321973</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 43</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_43&amp;diff=321973"/>
		<updated>2026-03-24T05:40:53Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 43 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 43&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_42&amp;diff=321972</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 42</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_42&amp;diff=321972"/>
		<updated>2026-03-24T05:40:52Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 42 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 42&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_41&amp;diff=321971</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 41</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_41&amp;diff=321971"/>
		<updated>2026-03-24T05:40:50Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 41 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 41&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_40&amp;diff=321970</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 40</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_40&amp;diff=321970"/>
		<updated>2026-03-24T05:40:49Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 40 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 40&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_39&amp;diff=321969</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 39</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_39&amp;diff=321969"/>
		<updated>2026-03-24T05:40:48Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 39 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 14 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 39&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_38&amp;diff=321968</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 38</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_38&amp;diff=321968"/>
		<updated>2026-03-24T05:40:46Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 38 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 38&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_37&amp;diff=321967</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 37</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_37&amp;diff=321967"/>
		<updated>2026-03-24T05:40:45Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 37 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 9 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 37&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_36&amp;diff=321966</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 36</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_36&amp;diff=321966"/>
		<updated>2026-03-24T05:40:43Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 36 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 36&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_35&amp;diff=321965</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 35</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_35&amp;diff=321965"/>
		<updated>2026-03-24T05:40:42Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 35 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 12 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 35&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_34&amp;diff=321964</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 34</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_34&amp;diff=321964"/>
		<updated>2026-03-24T05:40:41Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 34 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 14 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 34&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_33&amp;diff=321963</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 33</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_33&amp;diff=321963"/>
		<updated>2026-03-24T05:40:39Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 33 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 33&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_32&amp;diff=321962</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 32</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_32&amp;diff=321962"/>
		<updated>2026-03-24T05:40:38Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 32 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 32&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_31&amp;diff=321961</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 31</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_31&amp;diff=321961"/>
		<updated>2026-03-24T05:40:37Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 31 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 31&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_30&amp;diff=321960</id>
		<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 30</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_30&amp;diff=321960"/>
		<updated>2026-03-24T05:40:36Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 30 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 12 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 30&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_9&amp;diff=321959</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 9</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_9&amp;diff=321959"/>
		<updated>2026-03-24T05:40:34Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 9 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 12&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 12&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~3-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 3 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 12&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$144 |&lt;br /&gt;
| PT Plywood | ~$240 |&lt;br /&gt;
| OSB | ~$120 |&lt;br /&gt;
| Insulation | ~$72 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$626** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 9&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_8&amp;diff=321958</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 8</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_8&amp;diff=321958"/>
		<updated>2026-03-24T05:40:33Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 8 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 3 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 8&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_7&amp;diff=321957</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 7</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_7&amp;diff=321957"/>
		<updated>2026-03-24T05:40:32Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 7 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 7&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_6&amp;diff=321956</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 6</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_6&amp;diff=321956"/>
		<updated>2026-03-24T05:40:30Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 6 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 6&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_5&amp;diff=321955</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 5</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_5&amp;diff=321955"/>
		<updated>2026-03-24T05:40:29Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 5 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 5&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_4&amp;diff=321954</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 4</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_4&amp;diff=321954"/>
		<updated>2026-03-24T05:40:27Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 4 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 4&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_3&amp;diff=321953</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 3</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_3&amp;diff=321953"/>
		<updated>2026-03-24T05:40:26Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 3 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 3&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_2&amp;diff=321952</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 2</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_2&amp;diff=321952"/>
		<updated>2026-03-24T05:40:25Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 2 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 2&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_29&amp;diff=321951</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 29</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_29&amp;diff=321951"/>
		<updated>2026-03-24T05:40:24Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 29 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 29&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_28&amp;diff=321950</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 28</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_28&amp;diff=321950"/>
		<updated>2026-03-24T05:40:22Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 28 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 9&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 9&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 9&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$108 |&lt;br /&gt;
| PT Plywood | ~$180 |&lt;br /&gt;
| OSB | ~$90 |&lt;br /&gt;
| Insulation | ~$54 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$482** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 28&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_27&amp;diff=321949</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 27</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_27&amp;diff=321949"/>
		<updated>2026-03-24T05:40:21Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 27 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 5 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 27&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_26&amp;diff=321948</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 26</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_26&amp;diff=321948"/>
		<updated>2026-03-24T05:40:20Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 26 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 26&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_25&amp;diff=321947</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 25</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_25&amp;diff=321947"/>
		<updated>2026-03-24T05:40:19Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 25 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 25&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_24&amp;diff=321946</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 24</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_24&amp;diff=321946"/>
		<updated>2026-03-24T05:40:17Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 24 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 3 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 24&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_23&amp;diff=321945</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 23</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_23&amp;diff=321945"/>
		<updated>2026-03-24T05:40:16Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 23 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 23&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_22&amp;diff=321944</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 22</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_22&amp;diff=321944"/>
		<updated>2026-03-24T05:40:15Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 22 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 5 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 22&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_21&amp;diff=321943</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 21</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_21&amp;diff=321943"/>
		<updated>2026-03-24T05:40:14Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 21 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 21&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_20&amp;diff=321942</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 20</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_20&amp;diff=321942"/>
		<updated>2026-03-24T05:40:12Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 20 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 4 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 20&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_1&amp;diff=321941</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 1</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_1&amp;diff=321941"/>
		<updated>2026-03-24T05:40:11Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 1 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 1&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_19&amp;diff=321940</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 19</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_19&amp;diff=321940"/>
		<updated>2026-03-24T05:40:10Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 19 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 19&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_18&amp;diff=321939</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 18</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_18&amp;diff=321939"/>
		<updated>2026-03-24T05:40:09Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 18 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 3 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 18&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_17&amp;diff=321938</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 17</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_17&amp;diff=321938"/>
		<updated>2026-03-24T05:40:08Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 17 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 4 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 17&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_16&amp;diff=321937</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 16</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_16&amp;diff=321937"/>
		<updated>2026-03-24T05:40:07Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 16 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 16&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_15&amp;diff=321936</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 15</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_15&amp;diff=321936"/>
		<updated>2026-03-24T05:40:06Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 15 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 10&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 10&#039; wide × 8&#039; long × ~126&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 10&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$120 |&lt;br /&gt;
| PT Plywood | ~$200 |&lt;br /&gt;
| OSB | ~$100 |&lt;br /&gt;
| Insulation | ~$60 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$530** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 15&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_14&amp;diff=321935</id>
		<title>SH7/Walls EXTERIOR WALLS SH7 Wall Module 14</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_EXTERIOR_WALLS_SH7_Wall_Module_14&amp;diff=321935"/>
		<updated>2026-03-24T05:40:04Z</updated>

		<summary type="html">&lt;p&gt;Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;# Walls_EXTERIOR WALLS_SH7 - Wall Module 14 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&#039; x 8&#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&#039; wide × 8&#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
### Top Sheathing (3/4&amp;quot; OSB)&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| OSB | 1 | 4&#039; × 8&#039; | Top subfloor surface |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 4: Install Top Sheathing (Subfloor)&lt;br /&gt;
&lt;br /&gt;
**Step 8: Install OSB Sheathing**&lt;br /&gt;
1. Apply construction adhesive to joist tops&lt;br /&gt;
2. Start at one end, flush with frame edges&lt;br /&gt;
3. Drive 1-5/8&amp;quot; subfloor screws every 6&amp;quot; along edges, 8&amp;quot; in field&lt;br /&gt;
4. Stagger joints (offset from plywood layer below)&lt;br /&gt;
5. Leave 1/8&amp;quot; gap between sheets for expansion&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Walk entire surface. No squeaks or soft spots.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_EXTERIOR WALLS_SH7 - Wall Module 14&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>
		<author><name>Seeker</name></author>
	</entry>
</feed>