<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki.opensourceecology.org/index.php?action=history&amp;feed=atom&amp;title=OSE_Shop_2011_Level_Foundation_Stone</id>
	<title>OSE Shop 2011 Level Foundation Stone - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://wiki.opensourceecology.org/index.php?action=history&amp;feed=atom&amp;title=OSE_Shop_2011_Level_Foundation_Stone"/>
	<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=OSE_Shop_2011_Level_Foundation_Stone&amp;action=history"/>
	<updated>2026-04-19T07:11:55Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.39.13</generator>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=OSE_Shop_2011_Level_Foundation_Stone&amp;diff=37627&amp;oldid=prev</id>
		<title>DavidIAm: Created page with &quot;Correct the Foundation Stone level  Lay and compact the foundation stone first. Check the levels. Correct level will be approximately 14” higher on the West side than on the Ea...&quot;</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=OSE_Shop_2011_Level_Foundation_Stone&amp;diff=37627&amp;oldid=prev"/>
		<updated>2011-08-27T05:24:05Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Correct the Foundation Stone level  Lay and compact the foundation stone first. Check the levels. Correct level will be approximately 14” higher on the West side than on the Ea...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Correct the Foundation Stone level&lt;br /&gt;
&lt;br /&gt;
Lay and compact the foundation stone first.&lt;br /&gt;
Check the levels. Correct level will be approximately 14” higher on the West side than on the East side of&lt;br /&gt;
the building foundation. (This does NOT include the area laid out for the drainage system.)&lt;br /&gt;
Stone should not be moved to correct it if the resulting minimum stone depth is less than 5”&lt;br /&gt;
If needed, add stone to raise the level on the high (West) side of the shop floor.&lt;br /&gt;
Compact any corrected areas.&lt;br /&gt;
&lt;br /&gt;
[[Category:OSE_Shop_2011]]&lt;/div&gt;</summary>
		<author><name>DavidIAm</name></author>
	</entry>
</feed>