<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki.opensourceecology.org/index.php?action=history&amp;feed=atom&amp;title=SH7%2FWalls_INTERIOR_WALLS_SH7_Wall_Module_Interior_42</id>
	<title>SH7/Walls INTERIOR WALLS SH7 Wall Module Interior 42 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://wiki.opensourceecology.org/index.php?action=history&amp;feed=atom&amp;title=SH7%2FWalls_INTERIOR_WALLS_SH7_Wall_Module_Interior_42"/>
	<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_42&amp;action=history"/>
	<updated>2026-05-14T05:24:57Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.39.13</generator>
	<entry>
		<id>https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_42&amp;diff=321972&amp;oldid=prev</id>
		<title>Seeker: Auto-generated from FCStd geometry via OSE CAD Automator v2.0</title>
		<link rel="alternate" type="text/html" href="https://wiki.opensourceecology.org/index.php?title=SH7/Walls_INTERIOR_WALLS_SH7_Wall_Module_Interior_42&amp;diff=321972&amp;oldid=prev"/>
		<updated>2026-03-24T05:40:52Z</updated>

		<summary type="html">&lt;p&gt;Auto-generated from FCStd geometry via OSE CAD Automator v2.0&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;# Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 42 - Build Instructions&lt;br /&gt;
&amp;gt; **OSE Seed Home | 7&amp;#039; x 8&amp;#039; Floor Module**&lt;br /&gt;
&amp;gt; Auto-generated by OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; Date: January 21, 2026&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📋 Overview&lt;br /&gt;
&lt;br /&gt;
**Dimensions**: 7&amp;#039; wide × 8&amp;#039; long × ~8&amp;quot; deep&lt;br /&gt;
**Assembly Time**: ~2-4 hours (2 people)&lt;br /&gt;
**Skill Level**: Intermediate (framing experience helpful)&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔧 Tools Required&lt;br /&gt;
&lt;br /&gt;
| Tool | Purpose |&lt;br /&gt;
|------|---------|&lt;br /&gt;
| Circular Saw | Cutting lumber to length |&lt;br /&gt;
| Drill/Driver | Driving screws |&lt;br /&gt;
| Framing Square | Ensuring 90° corners |&lt;br /&gt;
| Tape Measure | Measuring / layout |&lt;br /&gt;
| Chalk Line | Marking joist positions |&lt;br /&gt;
| Level (4&amp;#039;) | Checking for level/flat |&lt;br /&gt;
| Speed Square | Marking cut lines |&lt;br /&gt;
| Hammer | Adjustments, persuasion |&lt;br /&gt;
| Safety Glasses | Eye protection |&lt;br /&gt;
| Work Gloves | Hand protection |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🪵 Lumber Cut List&lt;br /&gt;
&lt;br /&gt;
### Frame Lumber&lt;br /&gt;
| Part | Qty | Size | Notes |&lt;br /&gt;
|------|-----|------|-------|&lt;br /&gt;
| Framing 2X4 (2x4) | 5 | See CAD | From extracted data |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📦 Sheet Goods&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🔩 Hardware&lt;br /&gt;
&lt;br /&gt;
### Screws (Recommended)&lt;br /&gt;
| Type | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| 3&amp;quot; Deck Screws | ~50 | Joist-to-joist connections |&lt;br /&gt;
| 2&amp;quot; Deck Screws | ~100 | Sheathing to joists |&lt;br /&gt;
| 1-5/8&amp;quot; Subfloor Screws | ~100 | OSB to joists |&lt;br /&gt;
&lt;br /&gt;
### Optional/Recommended&lt;br /&gt;
| Item | Qty | Purpose |&lt;br /&gt;
|------|-----|---------|&lt;br /&gt;
| Construction Adhesive | 2 tubes | Glue sheathing to joists (reduces squeaks) |&lt;br /&gt;
| Joist Hangers (2x8) | 0 | Code-compliant joist connections |&lt;br /&gt;
| Simpson Strong-Ties | 4 | Corner reinforcement |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 🏗️ Assembly Steps&lt;br /&gt;
&lt;br /&gt;
### Phase 1: Build the Floor Frame (Ground Level)&lt;br /&gt;
&lt;br /&gt;
**Step 1: Layout Rim Joists**&lt;br /&gt;
1. Place both 8&amp;#039; rim joists parallel on sawhorses or blocks&lt;br /&gt;
2. Measure to ensure they are exactly 7&amp;#039; apart (outside to outside)&lt;br /&gt;
3. Mark joist locations on rim joists at 16&amp;quot; on-center&lt;br /&gt;
&lt;br /&gt;
**Step 2: Install Floor Joists**&lt;br /&gt;
1. Position first floor joist flush with one end&lt;br /&gt;
2. Drive 3 screws (or nails) through rim joist into joist end&lt;br /&gt;
3. Repeat for all 0 floor joists at marked locations&lt;br /&gt;
4. Use framing square to ensure 90° at each connection&lt;br /&gt;
&lt;br /&gt;
**Step 3: Square the Frame**&lt;br /&gt;
1. Measure diagonals (corner to corner)&lt;br /&gt;
2. Adjust until diagonals are equal (±1/8&amp;quot;)&lt;br /&gt;
3. Frame is now square&lt;br /&gt;
&lt;br /&gt;
&amp;gt; ✅ **QC Checkpoint**: Frame should be square, level, and all joists secured.&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
### Phase 5: Final QC &amp;amp; Completion&lt;br /&gt;
&lt;br /&gt;
**Final Inspection Checklist:**&lt;br /&gt;
- [ ] All screws/nails driven flush&lt;br /&gt;
- [ ] No gaps in insulation&lt;br /&gt;
- [ ] Subfloor is flat and level&lt;br /&gt;
- [ ] Edges clean and square&lt;br /&gt;
- [ ] Module ready for transport or installation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📐 Reference Diagrams&lt;br /&gt;
&lt;br /&gt;
### Joist Layout (Top View)&lt;br /&gt;
```&lt;br /&gt;
┌──────────────────────────────────────────────────────────────────────┐&lt;br /&gt;
│  RIM JOIST (8&amp;#039;)                                                    │&lt;br /&gt;
├────┬────┬────┬────┬────┬────────────────────────────────────────┬──────┤&lt;br /&gt;
│    │    │    │    │    │                                        │ ○    │&lt;br /&gt;
│    │    │    │    │    │                                        │water │&lt;br /&gt;
│    │    │    │    │    │                                        │inlet │&lt;br /&gt;
├────┴────┴────┴────┴────┴────────────────────────────────────────┴──────┤&lt;br /&gt;
│  RIM JOIST (8&amp;#039;)                                                    │&lt;br /&gt;
└──────────────────────────────────────────────────────────────────────┘&lt;br /&gt;
     ↑    ↑    ↑    ↑    ↑&lt;br /&gt;
   Joists @ 16&amp;quot; OC&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
### Cross-Section&lt;br /&gt;
```&lt;br /&gt;
        ┌────────────────────────────────────┐&lt;br /&gt;
        │      OSB (3/4&amp;quot;)                    │  ← Subfloor&lt;br /&gt;
        ├────┬─────────────────┬─────────────┤&lt;br /&gt;
        │2x8 │  INSULATION     │ 2x8        │  ← Joists + Batt&lt;br /&gt;
        │    │  R-30 BATT      │            │&lt;br /&gt;
        ├────┴─────────────────┴─────────────┤&lt;br /&gt;
        │      PT PLYWOOD (3/4&amp;quot;)             │  ← Moisture Barrier&lt;br /&gt;
        └────────────────────────────────────┘&lt;br /&gt;
```&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## ⏱️ Time Estimates&lt;br /&gt;
&lt;br /&gt;
| Phase | Time (2 people) |&lt;br /&gt;
|-------|-----------------|&lt;br /&gt;
| 1. Frame Assembly | 1 hour |&lt;br /&gt;
| 2. Bottom Sheathing | 1 hour |&lt;br /&gt;
| 3. Insulation | 30 min |&lt;br /&gt;
| 4. Top Sheathing | 1 hour |&lt;br /&gt;
| 5. QC &amp;amp; Cleanup | 30 min |&lt;br /&gt;
| **Total** | **4 hours** |&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 💰 Estimated Cost&lt;br /&gt;
&lt;br /&gt;
| Category | Cost |&lt;br /&gt;
|----------|------|&lt;br /&gt;
| Lumber | ~$84 |&lt;br /&gt;
| PT Plywood | ~$140 |&lt;br /&gt;
| OSB | ~$70 |&lt;br /&gt;
| Insulation | ~$42 |&lt;br /&gt;
| Hardware | ~$50 |&lt;br /&gt;
| **Total** | **~$386** |&lt;br /&gt;
&lt;br /&gt;
*Prices vary by region and market conditions.*&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
## 📝 Notes&lt;br /&gt;
&lt;br /&gt;
- This module is part of a multi-module floor system&lt;br /&gt;
- Ensure proper vapor barrier on bottom (PT plywood serves this purpose)&lt;br /&gt;
- Module designed to connect to other OSE modules&lt;br /&gt;
- See OSE Wiki for full Seed Home documentation&lt;br /&gt;
&lt;br /&gt;
---&lt;br /&gt;
&lt;br /&gt;
&amp;gt; **Generated by**: OSE Weaver Protocol v2.0 (Platinum Format)&lt;br /&gt;
&amp;gt; **Source File**: Walls_INTERIOR WALLS_SH7 - Wall Module - Interior 42&lt;br /&gt;
&amp;gt; **Agent**: Antigravity (Gemini)&lt;/div&gt;</summary>