The Liberator Packing List: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 21: Line 21:
[[Image:roller-guides.jpg|thumb|Fig. 4. Roller guides.]]
[[Image:roller-guides.jpg|thumb|Fig. 4. Roller guides.]]
#Shaker motor (Fig. 5)
#Shaker motor (Fig. 5)
[[Image:shaker motor.jpg|themb|Fig. 5. Shaker motor.]]
[[Image:shaker motor.jpg|thumb|Fig. 5. Shaker motor with return line assembly.]]
#Shaker motor return line assembly with needle valve (Fig. 5)
#Shaker motor return line assembly with needle valve (Fig. 5)
#Secondary cylinder
#Secondary cylinder
#Soil shaker assembly (Fig. 6)
#Soil shaker assembly (Fig. 6)
[[Image:shaker-assembly.jpg|thumb|Fig. 6. Soil shaker assembly.]]
[[Image:shaker-assembly.jpg|thumb|Fig. 6. Soil shaker assembly.]]
#





Revision as of 04:35, 10 June 2010

The first step in assembling The Liberator is unpacking the crate, in the reverse order as shown on the blog. First, assess that you can identify all the following parts. The machine labels in Fig. 2 and 3 and blog post should help to identify all the parts.


Crate.jpg
Fig. 2. Machine front view.
Fig. 3. Machine rear view.


The packing list is:

  1. Frame
  2. Soil grate
  3. Arms (2) - primary
  4. Arms (2) - secondary - the ones with the leg holders
  5. Soil loading drawer
  6. Legs (4)
  7. Feet (4)
  8. Back hopper supports (2)
  9. Front hopper supports (2)
  10. Roller guides (2) (Fig. 4)
Fig. 4. Roller guides.
  1. Shaker motor (Fig. 5)
Fig. 5. Shaker motor with return line assembly.
  1. Shaker motor return line assembly with needle valve (Fig. 5)
  2. Secondary cylinder
  3. Soil shaker assembly (Fig. 6)
Fig. 6. Soil shaker assembly.