The Liberator Free Enterprise: Difference between revisions
Jump to navigation
Jump to search
(Created page with '=Abstract= Getting a viable CEB freefab enterprise involve Category:Free Enterprise') |
No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
{{Category=CEB press}} | |||
=Abstract= | =Abstract= | ||
Getting a viable CEB [[freefab]] enterprise | Getting a viable CEB [[freefab]] enterprise involves: | ||
*Product optimization | |||
*Fabrication optimization | |||
*Marketing | |||
=Product Optimization= | |||
This requires achieving the predicted 12 brick per minute block pressing rate. 25 gpm valves are required. | |||
=Fabrication Optimization= | |||
Fabrication |
Latest revision as of 16:29, 15 February 2011
Abstract
Getting a viable CEB freefab enterprise involves:
- Product optimization
- Fabrication optimization
- Marketing
Product Optimization
This requires achieving the predicted 12 brick per minute block pressing rate. 25 gpm valves are required.
Fabrication Optimization
Fabrication