=Thu Jan 29, 2026=
=Wed Mar 18, 2026=
Created [[File:Wall_module_8ft.FCStd|8ft, single center stud wall module CAD file]]
[[Iconic CAD Workflow Example cdesantis Replication]] Cleaned up work log, the following items were given their own page
[[Documented tests & notes on possible AI Quality Control]]
[[Documented Cdesantis wall module build]]
[[Created 8ft single center stud wall module CAD file with AI]]
 
=Fri Feb 20, 2026=
Constructed the last roof module for the hangar. Marcin requested that we use diagonal compression supports - I cut the supports using Roy's miter saw. Started running air and power lines up to roof with Roy. Gathered OSB to be used in between roof modules with Tom. Finished the day with the last module and additional OSB on the roof!
 
=Thu Feb 19, 2026=
Spent the majority of the day constructing roof modules and jigs for them. Most of the wood was warped so major effort was needed to force them into straightness. The final module needed to be a different size and thus a different pattern too. Insulation was cut to match. Also learned the basic functions of a skid steer.


The following is a log of AI usage with a goal of creating the above CAD file. I had no prior experience with CAD before this interaction.
=Wed Feb 18, 2026=
Arrived at Factor e Farm for the first time. Spent two hours in the morning learning from Marcin. Then built eight 16' frames for hangar roof modules with Tom. Spent the rest of the day creating two risers, a 12' and a 7' 2" also with Tom. Learned lots about using nail gun, air compressor, circular saw vs corded saw efficiency, and even material logistics techniques.


Given the goal was to create an 8ftx4ft single center stud version of the wall module & that I already had in possession a 9ftx4ft double center stud version: I asked both chatgpt free version and claude sonnet 4.5 to make the needed edits to the existing file. Each of these interactions failed. They can be inspected here:
=Wed Feb 11, 2026=
https://chatgpt.com/share/697c2b33-53b0-800b-b0e2-42787f2fadbc
[[Documented tests & notes on possible AI Quality Control]]
https://claude.ai/share/eb96cbeb-875e-4bb6-b072-9fdd2a832d42


I then asked chatgpt to create the 8ftx4ft single center stud version with a detailed prompt unrelated to the old file. It failed to create the file sufficiently (though here I was just asking for a file as opposed to a macro script, so perhaps it would have responded better to a macro script request). You can see this interaction here:
=Sun Feb 1, 2026=
https://chatgpt.com/share/697c2b42-1438-800b-96e9-926dfce86792
[[Documented Cdesantis wall module build]]


Finally I asked claude sonnet 4.5 to create the 8ftx4ft single center stud version with the same detailed prompt unrelated to the old file. It not only responded with a CAD file but also a macro script. Upon executing the macro script a sufficient wall module was provided. You can see this interaction here:
=Thu Jan 29, 2026=
https://claude.ai/share/1f4a968b-aa1d-4682-aabb-65c8088094db
Created [[File:Wall_module_8ft.FCStd|8ft, single center stud wall module CAD file]] with AI
[[Created 8ft single center stud wall module CAD file with AI]]


=Wed Jan 14, 2026=
=Wed Jan 14, 2026=

Latest revision as of 20:43, 18 March 2026

Wed Mar 18, 2026

Iconic CAD Workflow Example cdesantis Replication Cleaned up work log, the following items were given their own page Documented tests & notes on possible AI Quality Control Documented Cdesantis wall module build Created 8ft single center stud wall module CAD file with AI

Fri Feb 20, 2026

Constructed the last roof module for the hangar. Marcin requested that we use diagonal compression supports - I cut the supports using Roy's miter saw. Started running air and power lines up to roof with Roy. Gathered OSB to be used in between roof modules with Tom. Finished the day with the last module and additional OSB on the roof!

Thu Feb 19, 2026

Spent the majority of the day constructing roof modules and jigs for them. Most of the wood was warped so major effort was needed to force them into straightness. The final module needed to be a different size and thus a different pattern too. Insulation was cut to match. Also learned the basic functions of a skid steer.

Wed Feb 18, 2026

Arrived at Factor e Farm for the first time. Spent two hours in the morning learning from Marcin. Then built eight 16' frames for hangar roof modules with Tom. Spent the rest of the day creating two risers, a 12' and a 7' 2" also with Tom. Learned lots about using nail gun, air compressor, circular saw vs corded saw efficiency, and even material logistics techniques.

Wed Feb 11, 2026

Documented tests & notes on possible AI Quality Control

Sun Feb 1, 2026

Documented Cdesantis wall module build

Thu Jan 29, 2026

Created File:Wall module 8ft.FCStd with AI Created 8ft single center stud wall module CAD file with AI

Wed Jan 14, 2026

Collin Written Application

Sun Jan 11, 2026

Collin video application