CEB Press/Manufacturing Instructions/Brick Holder Plate: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 20: Line 20:


[[Image:brick-holder.png|800px|The brickholder plate hole locations.]]
[[Image:brick-holder.png|800px|The brickholder plate hole locations.]]
=Google Sketchup File=
<html>
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=c12a8812826fae5fb38804396e417a9b&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
</html>

Revision as of 21:08, 22 December 2011

Main > Housing and construction > CEB Press > CEB press building instructions

Part Information

The brickholder plate mounts under the primary arms and becomes the ejecting surface for the compressed earth blocks.

The brickholder plate can be substituted by a set of rollers.

Tools

  • Hole Punch with 1" dies

Materials

  • Steel Plate 1/8" x 16" x 28.75"

Steps

  • Punch the 1" holes in the proper locations.

The brickholder plate hole locations.

Google Sketchup File