CEB Press/Manufacturing Instructions/Controller Mount: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(12 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Category=CEB press building instructions}}
{{Category=CEB press building instructions}}
{{Template:CEB Press Manufacturing Instructions Navbox}}
 
[[Image:controllermount.jpg|thumb|400px|right|The controller mount view from the back]]
=Part Information=
The controller mount attaches the controller box to the primary arms.
 
<html><iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=2616e5b5a549f3341211da1f85706ccd&etyp=sw&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe></html>
*The controller mount attaches the controller box to the primary arms.
=Tools Required=
 
=Tools=
 
*Hole punch with 13/16" die.
*Hole punch with 13/16" die.
*Drill press with 1/4" or larger bit.
*Welder
=Materials Required=
*1/4" x 6" flatbar: 15"
*1/4" x 2" flatbar: 12"
*Controller Box


=Diagrams=
*Drill press with 5/16" bit.
[[Image:controllerplate.png|600px]]
 
*Metal Marking Utensil
 
*Measuring Tape
 
=Materials=
 
*Steel Plate 40cm x 15cm x 0.6cm
 
*Lug Box
 
=Steps=
 
*Set the steel plate on a flat surface.
 
*Position the lug box over the steel plate such that the lug box is square with the steel plate and the lug box's top mounting hole is about 2cm from the top edge of the steel plate
 
*Using the marking utensil and the center punch, mark then center punch the 3 aligned hole locations on the steel plate
 
*Drill 5/16" holes through the steel plate at the marked points.
 
*Punch 2 holes of 13/16" diameter near the bottom exposed region of the steel plate.


=Fabrication instructions=
[[Image:ControllerBoxMount.png]]
#Find your controller box and locate its mounting holes on the back. Use spray paint to spray a nice wet coating over the hole locations, then press your 6x15 plate to it, square and so that the top hole is about a 1/2" away from the top, to mark the hole locations. Center punch them.
#Drill the 1/4" holes for the controller box. You can drill them a little bigger (up to 5/16") if you'd like, as it's difficult to get the holes perfectly aligned).
#Punch 13/16" holes as shown at the bottom of the plate.
#Weld the 2" flatbar perpendicularly to the plate on the back. The bottom should be flush with it, so the top hole for the controller is still accessible.

Latest revision as of 00:29, 23 December 2011

Main > Housing and construction > CEB Press > CEB press building instructions

Part Information

  • The controller mount attaches the controller box to the primary arms.

Tools

  • Hole punch with 13/16" die.
  • Drill press with 5/16" bit.
  • Metal Marking Utensil
  • Measuring Tape

Materials

  • Steel Plate 40cm x 15cm x 0.6cm
  • Lug Box

Steps

  • Set the steel plate on a flat surface.
  • Position the lug box over the steel plate such that the lug box is square with the steel plate and the lug box's top mounting hole is about 2cm from the top edge of the steel plate
  • Using the marking utensil and the center punch, mark then center punch the 3 aligned hole locations on the steel plate
  • Drill 5/16" holes through the steel plate at the marked points.
  • Punch 2 holes of 13/16" diameter near the bottom exposed region of the steel plate.

ControllerBoxMount.png