CEB Press/Manufacturing Instructions/Arms - primary: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Template:CEB Press Manufacturing Instructions Navbox}}
[[Image:Farmewitharms.jpg|thumb]]
[[Image:Farmewitharms.jpg|thumb]]


The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the [[Brickholder plate]], the [[Dirt-keeper plate]], the [[Controller Mount]], and the [[Valve Mount]].
=Part Information=


== Tools Required ==
The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.


Hole punch with 13/16" and 3/4" dies
=Tools=


== Materials Required ==
*Hole punch with 3/4" die


*2 pieces 72" long - 4"x6"x1/2" angle steel
*Measuring Tape


== Diagrams ==
*Metal Marking Utensil


=Materials=


*[2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length
=Steps=
*Mark and punch holes as shown below.


Left
Left


<html><iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=e9575044ab22492a1211da1f85706ccd&etyp=sw&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
[[Image:LeftPrimaryArm.png|700px]]
</html>


Right
Right


<html><iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=c3bd225ffa19896e1211da1f85706ccd&etyp=sw&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
[[Image:RightPrimaryArm.png|700px]]
</html>
 
<!--
Innaccurate!
shonda's print for the CEB
[[Image:primarynorm.png]]
[[Image:monsternorm.png]]
[[File:MAIN_ARM_CONTROL_SIDE_WITH_DETAIL.jpg]]
[[Image:beginningassembly.jpg|thumb|1400px]]-->


== Fabrication Steps ==
*Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.
Mark and punch all holes.
*Label which arm is the left and which is the right.

Latest revision as of 02:36, 23 December 2011

Farmewitharms.jpg

Part Information

The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.

Tools

  • Hole punch with 3/4" die
  • Measuring Tape
  • Metal Marking Utensil

Materials

  • [2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length

Steps

  • Mark and punch holes as shown below.

Left

File:LeftPrimaryArm.png

Right

File:RightPrimaryArm.png

  • Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.