Sawmill Project Status: Difference between revisions
Jump to navigation
Jump to search
(New page: *2.5.09 - We are currenlty going through review of the frame, and drawing up final 3D designs with specific v-groove roller wheels that we have sourced. We plan on getting the metal for th...) |
(No difference)
|
Latest revision as of 19:26, 5 February 2009
- 2.5.09 - We are currenlty going through review of the frame, and drawing up final 3D designs with specific v-groove roller wheels that we have sourced. We plan on getting the metal for the sawmill next Monday.