CNCCMV2/Structure: Difference between revisions
< CNCCMV2
Jump to navigation
Jump to search
No edit summary |
(→Safety) |
||
Line 1: | Line 1: | ||
=Safety= | =Safety= | ||
[http://opensourceecology.org/wiki/CNCCMV2/Structure/Safety Safety] | |||
=Point Marking with Datum Point/Edge= | =Point Marking with Datum Point/Edge= |
Revision as of 21:53, 24 April 2012
Safety
Point Marking with Datum Point/Edge
- Measure the appropriate distance from the datum point/edge and scribe the length point with 2 small lines
- Repeat for all dimensions, all points to be marked
Match Drilling
- Set 2 components one on top of the other, mount securely, then drill through both pieces at the same time for exact matching accuracy.
- Match drilling works effectively with templates
- Match drilling works effectively for pieces before they are cut apart