CNCCMV2/Structure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Safety=
=Preparation=


*Wear safety glasses and gloves during cutting, drilling, filing, and cleaning operations
[http://opensourceecology.org/wiki/CNCCMV2/Structure/Safety Safety]


=Point Marking with Datum Point/Edge=
[http://opensourceecology.org/wiki/CNCCMV2/Structure/Techniques Techniques]


*Measure the appropriate distance from the datum point/edge and scribe the length point with 2 small lines
=Fabrication=


*Repeat for all dimensions, all points to be marked
[http://opensourceecology.org/wiki/CNCCMV2/Structure/Cutting Cutting]


=Match Drilling=
[http://opensourceecology.org/wiki/CNCCMV2/Structure/Blocks Blocks]


*Set 2 components one on top of the other, mount securely, then drill through both pieces at the same time for exact matching accuracy.
[http://opensourceecology.org/wiki/CNCCMV2/Structure/Collars_Couplings Collars and Couplings]
 
*Match drilling works effectively with templates
 
*Match drilling works effectively for pieces before they are cut apart
 
=Cut Aluminum Flat Bar 1.5" x 3" x 48"=
 
*Mark metal with scribe and measuring tape: 4 lengths of 100mm, 2 lengths of 150mm, 2 length of 140mm, 1 length of 40mm
 
*Cut the marked lengths with bandsaw
 
=Cut Aluminum Flat Bar 0.375" x 3.5" x 10-12"=
 
*Mark metal with scribe and measuring tape: 2 lengths of 110mm
 
*Cut the marked lengths with bandsaw
 
=Cut Aluminum Round Bar 15mm Dia, 12" Lg=
 
*Mark metal with scribe and measuring tape: 6 lengths of 30mm
 
*Cut the marked lengths with bandsaw
 
=Cut Precision Shaft 5mm Dia, 200mm Lg=
 
*Mark metal with scribe and measuring tape: 1 length of 115mm
 
*Cut the marked lengths with bandsaw
 
=Cut Leadscrew=
 
*Cut with bandsaw: 3 lengths of 320mm, 1 length of 120mm
 
=Fabricate Platform=
 
*[[File: PlatformV2.pdf]]
 
*Qty=1
 
*Mark All Holes
 
*Use a single datum point
 
=Fabricate X Minor Block=
 
*[[File: XMinorBlockV2.pdf]]
 
*Qty=2
 
*Match all thru holes with corresponding X Major Blocks, Y Major Block, and Y Minor Block
 
*Mark all blind holes
 
*Tap holes as necessary
 
=Fabricate X Major Block=
 
*[[File: XMajorBlockV2.pdf]]
 
*Qty=2
 
*Mark all blind holes and remaining thru holes
 
*Tap holes as necessary
 
=Fabricate Y Minor Block=
 
*[[File: YMinorBlockV2.pdf]]
 
*Qty=1
 
*Match the Y-axis thru holes with Y Major Block and Z Mount Block
 
*Mark all blind holes
 
*Tap holes as necessary
 
=Fabricate Y Major Block=
 
*[[File: YMajorBlockV2.pdf]]
 
*Qty=1
 
*Mark all blind holes and remaining thru holes
 
*Tap holes as necessary
 
=Fabricate Z Minor Block=
 
*[[File: ZMinorBlockV2.pdf]]
 
*Qty=1
 
*Match all thru holes with Z Major Block, Z Mount Block (both ends), and End Mount Block
 
*Tap holes as necessary
 
=Fabricate Z Major Block=
 
*[[File: ZMajorBlockV2.pdf]]
 
*Qty=1
 
=Fabricate Z Mount Block=
 
*[[File: ZMountBlockV2.pdf]]
 
*Qty=1
 
*Mark all blind holes
 
=Fabricate Spindle Block=
 
*[[File: SpindleBlockV2.pdf]]
 
*Qty=1
 
*Match the mounting thru holes with End Mount Block
 
*Tap holes as necessary
 
=Fabricate End Mount Block=
 
*[[File: EndMountBlockV2.pdf]]
 
*Qty=1
 
*Mark all remaining blind holes
 
*Tap holes as necessary
 
=Fabricate Shaft Collar=
 
*[[File: ShaftCollarV2.pdf]]
 
*Qty= 12
 
*Mark and drill setscrew holes
 
*Lathe-drill shaft hole
 
*Tap setscrew holes
 
=Fabricate Axis Coupling=
 
*[[File: AxisCouplingV2.pdf]]
 
*Qty= 4
 
*Mark and drill setscrew holes
 
*Lathe-drill smaller shaft holes, then larger shaft holes
 
*Tap setscrew holes
 
=Fabricate Spindle Coupling=
 
*[[File: SpindleCouplingV2.pdf]]
 
*Qty= 1
 
*Mark and drill setscrew holes
 
*Lathe-drill smaller shaft holes, then larger shaft holes
 
*Tap setscrew holes
 
=Fabricate Spindle Bit Coupling=
 
*[[File: BitCouplingV2.pdf]]
 
*Qty= 1
 
*Mark and drill setscrew holes
 
*Lathe-drill smaller shaft holes, then larger shaft holes
 
*Tap setscrew holes

Latest revision as of 21:54, 24 April 2012