CEB: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
= | =Steps= | ||
*Lay small concrete blocks or pads along the exterior perimeter of the building; use waterproof sealing compound to ensure zero water penetration underneath these blocks/pads | |||
*Ready the dirt site for loading desirable dirt by clearing away the topsoil. | |||
*Position the CEB Press such that its output can be carried by rollers to the area where the next wall will be constructed. | |||
*Start mixing batches of slurry to be used for adhering the CEBs together. | |||
*Operate the CEB Press, loading and unloading dirt into its hopper. | |||
*Apply slurry at the top face of the existing CEB wall (if none, apply on the concrete); also slurry side faces on the existing wall that can be contacted by the next block to be laid. | |||
*Lay a block on the slurried surface and position it evenly with contact on the slurried side face. | |||
*Keep operating the CEB Press, mixing batches of slurry, and laying blocks until the wall is complete. | |||
*Reposition the CEB Press for further wall construction. | |||
*Rework the dirt extraction site if the piles of usable dirt are dwindling. |
Revision as of 05:15, 11 June 2012
Steps
- Lay small concrete blocks or pads along the exterior perimeter of the building; use waterproof sealing compound to ensure zero water penetration underneath these blocks/pads
- Ready the dirt site for loading desirable dirt by clearing away the topsoil.
- Position the CEB Press such that its output can be carried by rollers to the area where the next wall will be constructed.
- Start mixing batches of slurry to be used for adhering the CEBs together.
- Operate the CEB Press, loading and unloading dirt into its hopper.
- Apply slurry at the top face of the existing CEB wall (if none, apply on the concrete); also slurry side faces on the existing wall that can be contacted by the next block to be laid.
- Lay a block on the slurried surface and position it evenly with contact on the slurried side face.
- Keep operating the CEB Press, mixing batches of slurry, and laying blocks until the wall is complete.
- Reposition the CEB Press for further wall construction.
- Rework the dirt extraction site if the piles of usable dirt are dwindling.