Cold Saw/Build Instructions/Base to Vise: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 3: Line 3:
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Fixed_Block
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Fixed_Block


Check the mill's vertical alignment.
Check the magdrill's vertical alignment.


Mount a drill chuck to the mill.
Mount a drill chuck.


Mount the Fixed Block on the mill, oriented to drill the 4 mounting holes.
Clamp the Fixed Block, oriented to drill the 4 mounting holes.


Check the mount's vertical alignment.
Check the clamp's vertical alignment.


Mount a pilot bit onto the mill.
Change the bit for the pilot hole.


Drill the pilot holes, moving to each hole location accurately.
Drill the pilot holes, moving to each hole location accurately.


Change the bit for the thru hole diameter.
Change the bit for the thru hole.


Drill the thru holes, moving to each hole location.
Drill the thru holes, moving to each hole location.

Revision as of 18:32, 19 June 2012

Drilling the Fixed Block

http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Fixed_Block

Check the magdrill's vertical alignment.

Mount a drill chuck.

Clamp the Fixed Block, oriented to drill the 4 mounting holes.

Check the clamp's vertical alignment.

Change the bit for the pilot hole.

Drill the pilot holes, moving to each hole location accurately.

Change the bit for the thru hole.

Drill the thru holes, moving to each hole location.

Change the bit for the counterbore.

Drill the counterbore, moving to each hole location.

Drill the Base Flat

Drill the Base Plate