Cold Saw/Build Instructions/Base to Vise: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 3: | Line 3: | ||
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Fixed_Block | http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Fixed_Block | ||
Check the | Check the magdrill's vertical alignment. | ||
Mount a drill chuck | Mount a drill chuck. | ||
Clamp the Fixed Block, oriented to drill the 4 mounting holes. | |||
Check the | Check the clamp's vertical alignment. | ||
Change the bit for the pilot hole. | |||
Drill the pilot holes, moving to each hole location accurately. | Drill the pilot holes, moving to each hole location accurately. | ||
Change the bit for the thru hole | Change the bit for the thru hole. | ||
Drill the thru holes, moving to each hole location. | Drill the thru holes, moving to each hole location. |
Revision as of 18:32, 19 June 2012
Drilling the Fixed Block
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Fixed_Block
Check the magdrill's vertical alignment.
Mount a drill chuck.
Clamp the Fixed Block, oriented to drill the 4 mounting holes.
Check the clamp's vertical alignment.
Change the bit for the pilot hole.
Drill the pilot holes, moving to each hole location accurately.
Change the bit for the thru hole.
Drill the thru holes, moving to each hole location.
Change the bit for the counterbore.
Drill the counterbore, moving to each hole location.