Cold Saw/Build Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(19 intermediate revisions by 2 users not shown)
Line 1: Line 1:
=Source Hardware=
=Source Hardware=


http://opensourceecology.org/wiki/Cold_Saw/Sourcing
http://opensourceecology.org/wiki/Cold_Saw/Sourcing


=Vise: Drill Fixed Block=
=Cutting=
 
=Accessories=
 
=Base to Vise=
 
http://opensourceecology.org/wiki/Cold_Saw/Build_Instructions/Base_to_Vise
 
=Vise=
 
http://opensourceecology.org/wiki/Cold_Saw/Build_Instructions/Vise
 
=Swivel=
 
http://opensourceecology.org/wiki/Cold_Saw/Build_Instructions/Swivel
 
=Support=


=Base: Drill Base Flat=
http://opensourceecology.org/wiki/Cold_Saw/Build_Instructions/Support


http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Base_Flat
=Blade Guard=


Match drill using Fixed Block
http://opensourceecology.org/wiki/Cold_Saw/Build_Instructions/Blade_Guard


=Base: Drill Base Plate=
=Drive=


http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Baseplate
http://opensourceecology.org/wiki/Cold_Saw/Build_Instructions/Drive


Match drill using Base Flat
=Complete Assembly=


=Vise Assembly=
http://opensourceecology.org/wiki/Cold_Saw/Build_Instructions/Complete_Assembly


*'''Clamp Blocks onto Moving Blocks''': Tack weld + weld the Clamp Blocks onto the Moving Blocks, then surface grind the clamping face of the Clamp Blocks such that their clamping faces are parallel. Then drill the Jaw holes through the Clamp Blocks.
=90 Degree Cut Test=


*'''Threaded Rod and Nuts''': Position the Moving Block such that the Threaded Rod can be inserted vertically. Insert the Threaded Rod, then fasten the Nut onto the threaded rod such that the nut contacts the Moving Block. Center the nut approximately then tack weld + weld the nut onto the Moving Block.
Use dial indicator on circumference of blade.

Latest revision as of 23:10, 5 July 2012