Solar Array Video Outline: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
=Background Information= | =Background Information= | ||
''90 seconds'' | |||
*Site location | *Site location | ||
*Existing Electrical Systems | *Existing Electrical Systems | ||
Line 10: | Line 10: | ||
=Problem/Need Statement= | =Problem/Need Statement= | ||
''30 seconds'' | |||
*Factor E Farm needs more green energy production | *Factor E Farm needs more green energy production | ||
**1.5KW out of 20 KW currently being produced on site | **1.5KW out of 20 KW currently being produced on site | ||
Line 16: | Line 16: | ||
=Offer= | =Offer= | ||
''60 seconds'' | |||
*Solar Company | *Solar Company donates panels and installation costs of solar array to OSE. | ||
*In exchange, they get a tax write off, a video documenting the contribution, installation, etc., and they get international exposure through our media outreach. | |||
Installers get: Included in OSE Documentation. Tax deductible contribution. | Installers get: Included in OSE Documentation. Tax deductible contribution. | ||
=Shot List= | =Shot List= | ||
Shot List: Roof of Fab Lab, Hab Lab, Battery Bank, Area east and west of fab lab, satellite images | Shot List: Roof of Fab Lab, Hab Lab, Battery Bank, Area east and west of fab lab, satellite images |
Revision as of 23:34, 9 July 2012
Background Information
90 seconds
- Site location
- Existing Electrical Systems
- Ted Talk
- GVCS Update
- Mention global awareness of OSE
- NPR, TED, Europe, etc
Problem/Need Statement
30 seconds
- Factor E Farm needs more green energy production
- 1.5KW out of 20 KW currently being produced on site
Offer
60 seconds
- Solar Company donates panels and installation costs of solar array to OSE.
- In exchange, they get a tax write off, a video documenting the contribution, installation, etc., and they get international exposure through our media outreach.
Installers get: Included in OSE Documentation. Tax deductible contribution.
Shot List
Shot List: Roof of Fab Lab, Hab Lab, Battery Bank, Area east and west of fab lab, satellite images