Solar Array Video Outline: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Background Information=
=Background Information=
*90 Seconds Background
''90 seconds''
*Site location
*Existing Electrical Systems
*Ted Talk
*Ted Talk
*GVCS Update
*GVCS Update
*Mention global awareness of OSE
*Mention global awareness of OSE
**NPR, TED, Europe, etc
**NPR, TED, Europe, etc
==Section Script==
Open Source Ecology is a social enterprise founded by Dr.
==Shot List==




=Problem/Need Statement=
=Problem/Need Statement=
*30 Seconds Problem Statement
''30 seconds''
*Factor E Farm needs more green energy production  
*Factor E Farm needs more green energy production  
**1.5KW out of 20 KW currently  being produced on site  
**1.5KW out of 20 KW currently  being produced on site  
*Existing Electrical Systems
==Section Script==
Factor e Farm is located on a 30-acre site outside of Maysville, Missouri about an hour and a half north of Kansas City.
==Shot List==




=Offer=
=Offer=
*60 Seconds Request and Return Offer
''60 seconds''
*Solar Company sponsors installation of solar array on Fab Lab.
*Solar Company donates panels and installation costs of solar array to OSE.
*In exchange, they get a tax write off, a video documenting the contribution, installation, etc., and they get international exposure through our media outreach.
 
 
==Shot List==
 
 


Installers get: Included in OSE Documentation. Tax deductible contribution.


=Shot List=
=Shot List=
Shot List: Roof of Fab Lab, Hab Lab, Battery Bank, Area east and west of fab lab, satellite images
Shot List: Roof of Fab Lab, Hab Lab, Battery Bank, Area east and west of fab lab, satellite images

Latest revision as of 23:41, 9 July 2012

Background Information

90 seconds

  • Ted Talk
  • GVCS Update
  • Mention global awareness of OSE
    • NPR, TED, Europe, etc


Section Script

Open Source Ecology is a social enterprise founded by Dr.

Shot List

Problem/Need Statement

30 seconds

  • Factor E Farm needs more green energy production
    • 1.5KW out of 20 KW currently being produced on site
  • Existing Electrical Systems


Section Script

Factor e Farm is located on a 30-acre site outside of Maysville, Missouri about an hour and a half north of Kansas City.


Shot List

Offer

60 seconds

  • Solar Company donates panels and installation costs of solar array to OSE.
  • In exchange, they get a tax write off, a video documenting the contribution, installation, etc., and they get international exposure through our media outreach.


Shot List

Shot List

Shot List: Roof of Fab Lab, Hab Lab, Battery Bank, Area east and west of fab lab, satellite images