Nasos Tsionas log: Difference between revisions
Jump to navigation
Jump to search
Nasostsionas (talk | contribs) No edit summary |
Nasostsionas (talk | contribs) |
||
Line 18: | Line 18: | ||
== | == 23 July 2012 == | ||
Today we start a new project about a drill machine. We talk with Marchin about the details of the machine and also we deside how the machine will look like and how will work.Also I found some free time for swimming |
Revision as of 02:06, 24 July 2012
Preparation
Before our departure I edited the our presentation video for Marcin and his team. You can watch it here [1]
1 July 2012
Stuck to Chicage on the way to the farm due to customs delays. Nice opportunity to see the city along with George A. and George C. Upon returning to our the hotel we ended up to a hotel with a similar name. We managed to return to our own and enjoy the unexpected visit.
2 July 2012
Arrival at the farm. Setting up of the tents in which we will sleep.
23 July 2012
Today we start a new project about a drill machine. We talk with Marchin about the details of the machine and also we deside how the machine will look like and how will work.Also I found some free time for swimming