CEB Press/Manufacturing Instructions/Arms - primary: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(47 intermediate revisions by 8 users not shown)
Line 1: Line 1:
{{Category=CEB press building instructions}}
[[Image:Farmewitharms.jpg|thumb]]
 
=Part Information=
 
The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.
 
=Tools=
 
*Hole punch with 3/4" die
 
*Measuring Tape
 
*Metal Marking Utensil


[[Image:Farmewitharms.jpg|thumb]]
=Materials=


== Tools Required ==
*[2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length


=Steps=


*Mark and punch holes as shown below.


== Materials Required ==
Left


*4 pieces 72" long - 4"x6"x3/8" angle steel
[[Image:LeftPrimaryArm.png|700px]]


== Diagrams ==
Right


[[Image:RightPrimaryArm.png|700px]]


== Fabrication Steps ==
*Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.

Latest revision as of 02:36, 23 December 2011

Farmewitharms.jpg

Part Information

The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.

Tools

  • Hole punch with 3/4" die
  • Measuring Tape
  • Metal Marking Utensil

Materials

  • [2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length

Steps

  • Mark and punch holes as shown below.

Left

File:LeftPrimaryArm.png

Right

File:RightPrimaryArm.png

  • Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.