Collin Log: Difference between revisions
No edit summary |
|||
| (15 intermediate revisions by 2 users not shown) | |||
| Line 3: | Line 3: | ||
|} | |} | ||
{{RightTOC}} | {{RightTOC}} | ||
=Wed Mar 18, 2026= | |||
[[Iconic CAD Workflow Example cdesantis Replication]] Cleaned up work log, the following items were given their own page | |||
[[Documented tests & notes on possible AI Quality Control]] | |||
[[Documented Cdesantis wall module build]] | |||
[[Created 8ft single center stud wall module CAD file with AI]] | |||
=Fri Feb 20, 2026= | |||
Constructed the last roof module for the hangar. Marcin requested that we use diagonal compression supports - I cut the supports using Roy's miter saw. Started running air and power lines up to roof with Roy. Gathered OSB to be used in between roof modules with Tom. Finished the day with the last module and additional OSB on the roof! | |||
=Thu Feb 19, 2026= | |||
Spent the majority of the day constructing roof modules and jigs for them. Most of the wood was warped so major effort was needed to force them into straightness. The final module needed to be a different size and thus a different pattern too. Insulation was cut to match. Also learned the basic functions of a skid steer. | |||
=Wed Feb 18, 2026= | |||
Arrived at Factor e Farm for the first time. Spent two hours in the morning learning from Marcin. Then built eight 16' frames for hangar roof modules with Tom. Spent the rest of the day creating two risers, a 12' and a 7' 2" also with Tom. Learned lots about using nail gun, air compressor, circular saw vs corded saw efficiency, and even material logistics techniques. | |||
=Wed Feb 11, 2026= | |||
[[Documented tests & notes on possible AI Quality Control]] | |||
=Sun Feb 1, 2026= | |||
[[Documented Cdesantis wall module build]] | |||
=Thu Jan 29, 2026= | |||
Created [[File:Wall_module_8ft.FCStd|8ft, single center stud wall module CAD file]] with AI | |||
[[Created 8ft single center stud wall module CAD file with AI]] | |||
=Wed Jan 14, 2026= | =Wed Jan 14, 2026= | ||
| Line 8: | Line 33: | ||
=Sun Jan 11, 2026= | =Sun Jan 11, 2026= | ||
[[ | [[Collin video application]] | ||
Latest revision as of 20:43, 18 March 2026
Wed Mar 18, 2026
Iconic CAD Workflow Example cdesantis Replication Cleaned up work log, the following items were given their own page Documented tests & notes on possible AI Quality Control Documented Cdesantis wall module build Created 8ft single center stud wall module CAD file with AI
Fri Feb 20, 2026
Constructed the last roof module for the hangar. Marcin requested that we use diagonal compression supports - I cut the supports using Roy's miter saw. Started running air and power lines up to roof with Roy. Gathered OSB to be used in between roof modules with Tom. Finished the day with the last module and additional OSB on the roof!
Thu Feb 19, 2026
Spent the majority of the day constructing roof modules and jigs for them. Most of the wood was warped so major effort was needed to force them into straightness. The final module needed to be a different size and thus a different pattern too. Insulation was cut to match. Also learned the basic functions of a skid steer.
Wed Feb 18, 2026
Arrived at Factor e Farm for the first time. Spent two hours in the morning learning from Marcin. Then built eight 16' frames for hangar roof modules with Tom. Spent the rest of the day creating two risers, a 12' and a 7' 2" also with Tom. Learned lots about using nail gun, air compressor, circular saw vs corded saw efficiency, and even material logistics techniques.
Wed Feb 11, 2026
Documented tests & notes on possible AI Quality Control
Sun Feb 1, 2026
Documented Cdesantis wall module build
Thu Jan 29, 2026
Created File:Wall module 8ft.FCStd with AI Created 8ft single center stud wall module CAD file with AI