CEB Press/Manufacturing Instructions/Arms - primary: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(added info about what connects to it and finished instructions.)
No edit summary
 
(30 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Template:CEB Press Manufacturing Instructions Navbox}}
[[Image:Farmewitharms.jpg|thumb]]
[[Image:Farmewitharms.jpg|thumb]]


The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the [[Brickholder plate]], the [[Dirt-keeper plate]], the [[Controller Mount]], and the [[Valve Mount]].
=Part Information=


== Tools Required ==
The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.


Hole punch with 13/16" and 3/4" dies
=Tools=


== Materials Required ==
*Hole punch with 3/4" die


*2 pieces 72" long - 4"x6"x3/8" angle steel
*Measuring Tape


== Diagrams ==
*Metal Marking Utensil
 
=Materials=
 
*[2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length
 
=Steps=
 
*Mark and punch holes as shown below.


Left
Left


<html>
[[Image:LeftPrimaryArm.png|700px]]
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=4b3895a4daf1bff5b38804396e417a9b&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
</html>


Right
Right


<html>
[[Image:RightPrimaryArm.png|700px]]
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=f3f1afb53da762bcb38804396e417a9b&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
</html>


== Fabrication Steps ==
*Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.
Punch the holes on the 4" side of the angle iron first, all of them 1 1/4" from the edge of it.
* The 3/4" holes are located 2" and 70" from one end of the angle iron. The two arms will be mirror images of one another. (These holes are slightly smaller than the others to minimize play between the primary and secondary arms, preventing extra vibrations on the frame.)
*The 13/16" hole centers are located at 15", 31", 37", 39 5/8", 48 3/8", 53", and 64" from one end of the angle iron.  Make the two arms mirror images of one another.
*Determine which one is the right arm, and which is the left by looking at the model and label them.
Then punch the holes in the right arm for the plates. The holes for the grate mounts will be torched later.
*These hole locations are all 1 3/4" away from the edge of the iron, and their diameters are 13/16".
*They should be 9", 13", 18", and 28" from the end when the arm is in the right position (see model).

Latest revision as of 02:36, 23 December 2011

Farmewitharms.jpg

Part Information

The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.

Tools

  • Hole punch with 3/4" die
  • Measuring Tape
  • Metal Marking Utensil

Materials

  • [2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length

Steps

  • Mark and punch holes as shown below.

Left

File:LeftPrimaryArm.png

Right

File:RightPrimaryArm.png

  • Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.