User:Rrrojer: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Log ==
== Log ==
''2011-10-12''
* Ordered 2 [http://www.amazon.com/gp/product/B003B8PPEY/ref=ox_sc_act_title_3?ie=UTF8&m=ATVPDKIKX0DER Western Digital 1 TB bus-powered external hard drives] via Amazon ($79.99 each) for video storage & backup.
''2011-10-13''
* Began editing Soldering Video
* B-Roll for Controller Box Video
* Concrete Forms


''2011-10-14''
''2011-10-20''
 
''2011-10-21''
* Script for LifeTrac Valves
* Phone call w/ Brianna
* Filmed CEB being moved 
 
''2011-10-20''
* Cleaned Kitchen
* File Management - Archived FCP project files onto OSE_02 - http://documentation.apple.com/en/finalcutpro/usermanual/index.html#chapter=94%26section=10
* File Management - Moved Capture Scratch onto OSE_02
* Began [[Video Documentation Best Practices]]
* Copied & logged Briana's footage


''2011-10-15''
''2011-10-19''
* Blogged Controller Box Instructionals - http://blog.opensourceecology.org/2011/10/dedicated-project-visit-rebecca-rojer/
* P/U'd hard drives from Post Office
* File Management - Time Machine
* Gathered Kindling
* Read through [[Shuttleworth_Fellowship_Application]], Biz Plan brief


''2011-10-16''
''2011-10-18''
* Shot, edited & published TrueFans Update - http://vimeo.com/30660860
* Final pass, upload on Controller Box Instructional
* Diagram of wiring for Controller Box - http://opensourceecology.org/wiki/File:Ceb-controllerbox-small.png
* Wood-Burning Stove Installation, Fail
* Brainstorm w/ Marcin on [[2011 Recruitment Campaign]]


''2011-10-17''
''2011-10-17''
Line 20: Line 32:
* Edited Controller Box Instructional
* Edited Controller Box Instructional


''2011-10-18''
''2011-10-16''
* Final pass, upload on Controller Box Instructional
* Shot, edited & published TrueFans Update - http://vimeo.com/30660860
* Diagram of wiring for Controller Box - http://opensourceecology.org/wiki/File:Ceb-controllerbox-small.png
 
''2011-10-15''
* Script for Controller Box Video
 
 
''2011-10-14''
* Concrete Poured - took footage
* Uploaded Soldering Instructional - http://vimeo.com/30576131
* B-Roll for Controller Box Video
 
 
''2011-10-13''
* Edited Soldering Instructional
* Helped w/ concrete forms & gravel pushing


''2011-10-19''
* Blogged instructionals - http://blog.opensourceecology.org/2011/10/dedicated-project-visit-rebecca-rojer/
* P/U'd hard drives from Post Office


''2011-10-20''
''2011-10-12''
* Cleaned Kitchen
* Ordered 2 [http://www.amazon.com/gp/product/B003B8PPEY/ref=ox_sc_act_title_3?ie=UTF8&m=ATVPDKIKX0DER Western Digital 1 TB bus-powered external hard drives] via Amazon ($79.99 each) for video storage & backup.
* Script for LED Soldering Vid


==General Notes==
==General Notes==
Line 36: Line 60:


==To Do==
==To Do==
* Figure out workflow
''To-Do''
* Research uploading video to archive.org for ease of crowd-sourced video editing
* Find & Upload Files for Brianna
* Script for LifeTrac Valves
* Script for CEB Fabrication:
** Plates
** Primary Arms
** Secondary Arms
** Drawer
** Adjusting the Drawer Members
** Hopper
** Shaker Motor
* Vid for [[Shuttleworth_Fellowship_Application]]
* Script for Recruitment Video
 
 




==Dream==
''Dream''
List of videos from Ian:
List of videos from Ian:
# Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
# Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
#Fabrication steps for soil loading drawer
# Fabrication steps for soil loading drawer
# Edit of assembly procedure for entire frame, starting from components
# Edit of assembly procedure for entire frame, starting from components
# Building hopper shaker assembly
# Building hopper shaker assembly
Line 51: Line 88:
# Hydrauilics hookup and operation procedure
# Hydrauilics hookup and operation procedure
# Brick pressing sequence explanation
# Brick pressing sequence explanation
10. Sawmill: operation procedures from existing footage
# Sawmill: operation procedures from existing footage
11. Tractor: wheel attachment procedure
# Tractor: wheel attachment procedure
12. Tractor: loader mounting procedure
# Tractor: loader mounting procedure
13. Power Cube: overall assembly procedure starting from raw parts
# Power Cube: overall assembly procedure starting from raw parts
14. Soil pulverizer: overall assembly procedure
# Soil pulverizer: overall assembly procedure
15. Power Cube: wiring walkthrough
# Power Cube: wiring walkthrough
16. CEB press: field operating procedure from setup to bricks pressed
# CEB press: field operating procedure from setup to bricks pressed
 
==Done==


* Research uploading video to archive.org for ease of crowd-sourced video editing


== About ==
== About ==

Latest revision as of 15:18, 22 October 2011

Log

2011-10-20

2011-10-21

  • Script for LifeTrac Valves
  • Phone call w/ Brianna
  • Filmed CEB being moved

2011-10-20

2011-10-19

2011-10-18

  • Final pass, upload on Controller Box Instructional
  • Wood-Burning Stove Installation, Fail
  • Brainstorm w/ Marcin on 2011 Recruitment Campaign

2011-10-17

  • Re-compressed TrueFans Update with correct sequence settings
  • Picked Up Wood-Burning Stove
  • Edited Controller Box Instructional

2011-10-16

2011-10-15

  • Script for Controller Box Video


2011-10-14


2011-10-13

  • Edited Soldering Instructional
  • Helped w/ concrete forms & gravel pushing


2011-10-12

General Notes

  • Convert all footage in compressor to apple prores, 29.97fps
  • Try to think in steps

To Do

To-Do

  • Find & Upload Files for Brianna
  • Script for LifeTrac Valves
  • Script for CEB Fabrication:
    • Plates
    • Primary Arms
    • Secondary Arms
    • Drawer
    • Adjusting the Drawer Members
    • Hopper
    • Shaker Motor
  • Vid for Shuttleworth_Fellowship_Application
  • Script for Recruitment Video



Dream List of videos from Ian:

  1. Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
  2. Fabrication steps for soil loading drawer
  3. Edit of assembly procedure for entire frame, starting from components
  4. Building hopper shaker assembly
  5. Building of hopper superstructure and connection to frame
  6. Asembly and function of cylinder ajusters: forward, side to side, and drawer adjusters
  7. Documentation of CEB machine dimensions, piece by piece
  8. Hydrauilics hookup and operation procedure
  9. Brick pressing sequence explanation
  10. Sawmill: operation procedures from existing footage
  11. Tractor: wheel attachment procedure
  12. Tractor: loader mounting procedure
  13. Power Cube: overall assembly procedure starting from raw parts
  14. Soil pulverizer: overall assembly procedure
  15. Power Cube: wiring walkthrough
  16. CEB press: field operating procedure from setup to bricks pressed
  • Research uploading video to archive.org for ease of crowd-sourced video editing

About