CEB Press/Manufacturing Instructions/Arms - primary: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:CEB Press Manufacturing Instructions Navbox}}
[[Image:Farmewitharms.jpg|thumb]]
[[Image:Farmewitharms.jpg|thumb]]


The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the [[Brickholder plate]], the [[Dirt-keeper plate]], the [[Controller Mount]], and the [[Valve Mount]].
=Part Information=


== Tools Required ==
The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.


Hole punch with 13/16" and 3/4" dies
=Tools=


== Materials Required ==
*Hole punch with 3/4" die


*2 pieces 72" long - 4"x6"x1/2" angle steel
*Measuring Tape


== Diagrams ==
*Metal Marking Utensil


=Materials=


*[2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length
=Steps=
*Mark and punch holes as shown below.


Left
Left


<html>
[[Image:LeftPrimaryArm.png|700px]]
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=b9f2ca6c888c44b1211da1f85706ccd&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
</html>


Right
Right


<html>
[[Image:RightPrimaryArm.png|700px]]
<iframe src="http://sketchup.google.com/3dwarehouse/mini?mid=a1726f85eefc4fe51211da1f85706ccd&etyp=im&width=400&height=300" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="400" height="300"></iframe>
</html>
 
<!--
Innaccurate!
shonda's print for the CEB
 
[[File:MAIN_ARM_CONTROL_SIDE_WITH_DETAIL.jpg]]
[[Image:beginningassembly.jpg|thumb|1400px]]-->
[[Image:primarynorm.png]]
[[Image:monsternorm.png]]


== Fabrication Steps ==
*Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.
Mark and punch all holes.

Latest revision as of 02:36, 23 December 2011

Farmewitharms.jpg

Part Information

The primary arms attach the cylinder/frame assembly to the secondary arms, which support it. They also attach to the Brickholder Plate, the Dirt-Keeper Plate, the Controller Mount, and the Valve Mount.

Tools

  • Hole punch with 3/4" die
  • Measuring Tape
  • Metal Marking Utensil

Materials

  • [2] Steel Angle 4" A by 6" B, 1/2" Thickness, 72" Length

Steps

  • Mark and punch holes as shown below.

Left

File:LeftPrimaryArm.png

Right

File:RightPrimaryArm.png

  • Label arms as left and right from the perspective of an observer looking at the CEB Press from the ejection side.