Power Cube 6/Research Development: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
*Gas filling is readily accessible with 2 vertically-stacked power cubes | *Gas filling is readily accessible with 2 vertically-stacked power cubes | ||
*Engine does not stick out the top | *Engine does not stick out the top | ||
* | |||
= Manuals = | |||
* Engine http://www.briggsandstratton.com/us/en/support/manuals/results?NTT=49M777-0853-G5 | |||
[[category:Power Cube]] | [[category:Power Cube]] |
Latest revision as of 19:57, 24 February 2014
Design Requirements - Dream Checklist
- O-level access parts replaceability for all parts
- Exhaust must be kept away from hoses
- Muffler must be dismountable by itself
- Control panel does not interfere with hose attachment
- Control panel has screw-down terminals or spade terminals for easy attachment of wires
- Return line does not splash out the breather
- Gas filling is readily accessible
- Gas filling is readily accessible with 2 vertically-stacked power cubes
- Engine does not stick out the top