Point To Peer: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 51: Line 51:
***Economic analysis of solar energy production
***Economic analysis of solar energy production
***Economic analysis of energy storage production
***Economic analysis of energy storage production
*Final business plan to be drafted by May 26, 2008
*Technical development period: June - December 1, 2008
*Fundraising, PR, begun December 1
*Deployment begun January 1, 2009


=Feedback=
=Feedback=


We welcome your feedback on any points of this project. -The Management
We welcome your feedback on any points of this project. -The Management

Revision as of 23:33, 27 February 2008

Introduction

This is a page dedicated to the development of a peer-to-peer internet and communications infrastructure.

Development Team

  • Marcin Jakubowski
  • Sam Rose
  • Paul

Join the team! Email samuel.rose at gmail.com

Proposed Plan

The core of a peer-based internet system proposal is to provide an at-cost infrastructure for internet communications. Such an infrastructure may be implemented most easily via a network of wireless towers. User nodes store content in a distributed fashion. Key technical issues are:

  1. Development of communication and storage protocol based on peer-to-peer strategies
    1. Storage on peer computer nodes
  2. Building of wireless emitter/receiver nodes
  3. Building towers
  4. Powering wireless nodes

Implementation

  1. Development of communication and storage protocol is a tractable problem
  2. Capitalization may be obtained readily by involving a large number of internet users, paying perhaps $25/year or whatever the at-cost price may be
    1. 1 node every 10 miles, or every 100 sq miles (ex: 30,000 nodes for 3M sq miles of the USA
    2. Assume 10M initial subscribers- $2.5 billion in startup revenue available
    3. Each node has $100k allotment available

Strategy

Cost reduction for a project of this magnitude is feasible. $100k/node provides for feasibility using off-shelf technology. However, we want to go for open source components to assure maximum value. I propose we use $1-10M to develop open source, at-cost production facilities for hardware:

  • wireless nodes - via CNC routers
  • mobile, onsite aluminum production for towers from on-site clay
  • open source protocol and code
  • open source solar concentrator or OS PV production (ribbon PV is an immediate candidate)
  • storage battery production - sealed lead acid
  • power electronics - inverter and power conditioning for tower

Project Status

  • Zero Hour began at 5 PM, Wednesday, February 26, 2008
  • Initial business plan to be drafted by March 26, 2008
    • Due diligence required: dedicated email list, publicity via networks
    • Dedicated webspace; opensourceecology.org volunteered at present
  • Refined business plan to be drafted by April 26, 2008
    • Due diligence required:
      • Economic feasibility of mobile aluminum smelting unit
      • Economic analysis of node hardware fabrication
      • Economic analysis of solar energy production
      • Economic analysis of energy storage production
  • Final business plan to be drafted by May 26, 2008
  • Technical development period: June - December 1, 2008
  • Fundraising, PR, begun December 1
  • Deployment begun January 1, 2009

Feedback

We welcome your feedback on any points of this project. -The Management