Alex Au Log: Difference between revisions
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
* Learning FreeCAD — 15-20 hours | * Learning FreeCAD — 15-20 hours | ||
* Documenting Work — 2.5 hours | * Documenting Work — 2.5 hours | ||
Self Grade: | |||
95/100 | Mis-edited portion of video documentation near the beginning. Got cube together. Also ran into trouble with tubes being re-positioned when fastening bolts. | |||
Links: | |||
[[Alex Au's Feedback on Developer Test]] | [https://drive.google.com/open?id=1ErIRzy72uCoSsTkfBBcgElhr1duxTIOh Link to FreeCAD file of cube] | [https://youtu.be/eVIdVMIsobw Video Documentation of Alex Au's OSE Developer Test] | [[Alex Au's Feedback on Developer Test]] | [https://drive.google.com/open?id=1ErIRzy72uCoSsTkfBBcgElhr1duxTIOh Link to FreeCAD file of cube] | [https://youtu.be/eVIdVMIsobw Video Documentation of Alex Au's OSE Developer Test] |
Revision as of 16:12, 31 July 2018
Tue July 31, 2018
Time spent on OSE developer test:
- Installing Linux — 10-15 hours
- Learning FreeCAD — 15-20 hours
- Documenting Work — 2.5 hours
Self Grade: 95/100 | Mis-edited portion of video documentation near the beginning. Got cube together. Also ran into trouble with tubes being re-positioned when fastening bolts.
Links: Alex Au's Feedback on Developer Test | Link to FreeCAD file of cube | Video Documentation of Alex Au's OSE Developer Test