#1” by 1/4” aluminum bar< ''72.5'W+140'L-5'for corners= 207.5' good thing you don't have to worry about saltwater spray. imagine ordering this much stainless steel! This might be a bit much for local stores, we shall see'' | #1” by 1/4” aluminum bar< ''72.5'W+140'L-5'for corners= 207.5' good thing you don't have to worry about saltwater spray. imagine ordering this much stainless steel! This might be a bit much for local stores, we shall see'' | ||
#u-channel for edges (will we do clips or do full bars and drill? One will require more drilling, the other more cutting?? the difference will necessitate only about 5' additional. pg 96) | #u-channel for edges (will we do clips or do full bars and drill? One will require more drilling, the other more cutting?? the difference will necessitate only about 5' additional. pg 96) | ||
#shrink tube – | #shrink tube – | ||
#window screen – L/M - suggests | #window screen – L/M - suggests fiberglass insect screening medium. Must evaluate pros and cons of using metal or fiberglass. | ||
#tabbing ribbon – need 12.5” per cell – total of about 520 feet! <rd pg 79-82. we might need more per cell, more like 15". it must run between the cells as well as along them. so, maybe as much as 620' | #tabbing ribbon – need 12.5” per cell – total of about 520 feet! <rd pg 79-82. we might need more per cell, more like 15". it must run between the cells as well as along them. so, maybe as much as 620' | ||
#bus ribbon - estimating about 82'. We will need to do a scaled schematic/structural drawing to calculate this | #bus ribbon - estimating about 82'. We will need to do a scaled schematic/structural drawing to calculate this | ||
Line 29: | Line 29: | ||
#2-wire terminal | #2-wire terminal | ||
#wire for panel connection | #wire for panel connection | ||
#junction box - | #junction box - 15x | ||
#epoxy for junction box | #epoxy for junction box | ||
#Clear plastic pony beads 4" Craft store 8 per panel, 120 Total | #Clear plastic pony beads 4" Craft store 8 per panel, 120 Total |
Revision as of 00:30, 26 June 2008
Basic Design
- 156 mm square cells
- 4x8 cell panels, total of 32 cells per panel
- dimensions – 29”x56” for each panel
- 112 designer watts
- we have enough solar cells for 15 panels
look @ pg. 43 of hurley for an example layout of the panels. The example is 4x8 as well, though the cells are larger than in the example, about 6.14 in^2. These sound fairly large, about 2.5'x4.5'. If we are working on two at a time with a small team of people, we will need significant table space.
Parts
- 3/16” Plexiglas – Lowes/Menards (L/M) – price:
- case backing, aluminum – McMaster Carr or local sheet metal shop
- 1” by 1/4” aluminum bar< 72.5'W+140'L-5'for corners= 207.5' good thing you don't have to worry about saltwater spray. imagine ordering this much stainless steel! This might be a bit much for local stores, we shall see
- u-channel for edges (will we do clips or do full bars and drill? One will require more drilling, the other more cutting?? the difference will necessitate only about 5' additional. pg 96)
- shrink tube –
- window screen – L/M - suggests fiberglass insect screening medium. Must evaluate pros and cons of using metal or fiberglass.
- tabbing ribbon – need 12.5” per cell – total of about 520 feet! <rd pg 79-82. we might need more per cell, more like 15". it must run between the cells as well as along them. so, maybe as much as 620'
- bus ribbon - estimating about 82'. We will need to do a scaled schematic/structural drawing to calculate this
- stainless steel screws - assuming 18 per panel, at least 270, on pg 132, SS pan head slotted machine screw 10-24 1.5"L (or up to 2")
- stainless steel machine screw nuts - at least270 Stainless Steel Machine Screw nut 10-24 screw size, 3/8" width, 1/8" height.
- stainless steel 18-8 large OD flat washer 10 screw size 13/64" ID, 1/2" OD, .033" -.047" thick.
- GE Silicone II sealant, clear
- GE RTV 615 optically clear silicone Circuit Specialists RTV615-1P 1 pint (for 4 panels) - 1 gal
- Xylene (xylol) solvent Hardware store 1 pint (for 4 panels) - 1 gal
- two brushes for encapsulant
- 60/40 solder - or PB free silver based? For the health of the assemblers? Add'l cost for heavy metal health and safety protection equipment...- though 60/40 available locally @ L/M
- 2-wire terminal
- wire for panel connection
- junction box - 15x
- epoxy for junction box
- Clear plastic pony beads 4" Craft store 8 per panel, 120 Total
- Silicone rubber strip 3/32" thick, 2" width 36" long
- 15 Schottky diodes (shottky are a bit more, but .3 V drop instead of .7 V is important)
Tools
- variable temp soldering iron x2 – may have to order online, will call
- needle nose pliers - L/M prob.
- Plexiglas "plastic sheet" cutters - L/M prob.
- Flux Plen 186FP Mildly activated rosin, type RMA HMC electronics - says 2 pens or as needed for 4 panels
- Reamer bit?
- 7/32 drill bit (might want an extra or two?) L/M
Work Plan
Hope to have 4 people total. Lots of cutting, soldering, silicone and epoxy brushing to do. Split into two teams, rotating duties,
Duty 1: Soldering and wiring, Duty 2: Panel assemblage.
Since panels can be prepared before the cells are soldered together, these two tasks can be done simultaneously, saving time. Cutting will be taxing, so this will require lots of rotation, and will also require proper safety equipment. Cutting of U channel, aluminum bar, plexiglas, possible precutting of Tab and Bus? Having to cut as you go might slow down the process.
Will necessitate refreshments, possible gas reimbursement (its expensive these days!). Might have to have a beer or two at the end of the day...
possible schedule (who am I to set a schedule?) saturday: 8:00 wake up, work at 9:00, break at noon or one for lunch, continue til 7:00? 8hrs x 4ppl= 32 human hours Sunday: 8:00 wake up, work at 9:00, break at noon or one for lunch, continue til whenever we need to leave.
During the process, we need to be documenting it all with video and picture. Might want to borrow an extra camera.
I have Hurley's book printed and in a binder, so it will serve us well in shop. Might want another? We will see. Might be able to seperate cells and panel work sections.
Participants:
Still have to figure out who all is going. Vince says maybe, he is wigged out on working two jobs and can barely think right now. He will finish up MSA on saturday and probably spend two days sleeping. Sri, a friend from here in columbia, very scientifically minded med student and sustainability enthusiast says she really wants to go. Everyone wants the weekend of the 11th because the weekend I have been proposing contains independence day. What about grid independence day! We will see what happens. There are several more interested parties, including mike. We could end up with as many as 6 participants. I might try to come down the weekend before that as well, as sitting around watching fireworks doesn't seem to be an appropriate celebration of independence for me. A friend of mine from natural resources (spec. soil science) has also spoken of coming out the weekend of the 11th, pending his new job schedule.