CEB Press/Manufacturing Instructions/Soil loading drawer: Difference between revisions
Jump to navigation
Jump to search
William Neal (talk | contribs) No edit summary |
William Neal (talk | contribs) No edit summary |
||
Line 15: | Line 15: | ||
[[File:Drawer_Parts.jpg|200px|left|Drawer Parts]] | [[File:Drawer_Parts.jpg|200px|left|Drawer Parts]] | ||
== Fabrication Steps == | == Fabrication Steps == |
Revision as of 18:24, 18 August 2011
Main > Housing and construction > CEB Press > CEB press building instructions
Tools Required
Materials Required
ID | Quant | Type | Length | Total | Name | Detail |
Diagrams
Fabrication Steps
(note: part numbers refer to the recently-published parts list on the Bill of Materials page)
- Line up the Inner and Outer Rails (S27, S28) and clamp them together with vise grips.
- Clamp the Sides (S29), Press Plate (S26), Tube (S24), Roof(S25) and Back (S22) and the rails together with vise-grips and C-Clamps.
- Tack weld the clamped drawer at a few locations down to prevent warping when it is welded together.
- Complete the welding joints, welding at different locations as you go to prevent warping.
- Check the completed drawer to ensure that it is still straight.
- If they are not straight, the rails may need to be adjusted to ensure that the bearings will roll fit them correctly; if the drawer is not even and aligned, it may not fit properly in the frame.
- Weld the Cylinder Tongue (S23) to the centre of the Back (S22) of the Drawer.