User:Rrrojer: Difference between revisions
Jump to navigation
Jump to search
(→Dream) |
No edit summary |
||
Line 1: | Line 1: | ||
== Log == | |||
'2011-10-12' | |||
* Ordered 2 [http://www.amazon.com/gp/product/B003B8PPEY/ref=ox_sc_act_title_3?ie=UTF8&m=ATVPDKIKX0DER Western Digital 1 TB bus-powered external hard drives] via Amazon ($79.99 each) for video storage & backup. | |||
==General Notes== | ==General Notes== | ||
* Convert all footage in compressor to apple prores, 29.97fps | * Convert all footage in compressor to apple prores, 29.97fps | ||
* Try to think in steps | * Try to think in steps | ||
==Do== | ==To Do== | ||
* Figure out workflow | * Figure out workflow | ||
* Research uploading video to archive.org for ease of crowd-sourced video editing | * Research uploading video to archive.org for ease of crowd-sourced video editing | ||
==Dream== | ==Dream== |
Revision as of 16:12, 12 October 2011
Log
'2011-10-12'
- Ordered 2 Western Digital 1 TB bus-powered external hard drives via Amazon ($79.99 each) for video storage & backup.
General Notes
- Convert all footage in compressor to apple prores, 29.97fps
- Try to think in steps
To Do
- Figure out workflow
- Research uploading video to archive.org for ease of crowd-sourced video editing
Dream
List of videos from Ian:
- Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
- Fabrication steps for soil loading drawer
- Edit of assembly procedure for entire frame, starting from components
- Building hopper shaker assembly
- Building of hopper superstructure and connection to frame
- Asembly and function of cylinder ajusters: forward, side to side, and drawer adjusters
- Documentation of CEB machine dimensions, piece by piece
- Hydrauilics hookup and operation procedure
- Brick pressing sequence explanation
10. Sawmill: operation procedures from existing footage 11. Tractor: wheel attachment procedure 12. Tractor: loader mounting procedure 13. Power Cube: overall assembly procedure starting from raw parts 14. Soil pulverizer: overall assembly procedure 15. Power Cube: wiring walkthrough 16. CEB press: field operating procedure from setup to bricks pressed
Done
About