User:Rrrojer: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(→Log) |
||
Line 2: | Line 2: | ||
''2011-10-12'' | ''2011-10-12'' | ||
* Ordered 2 [http://www.amazon.com/gp/product/B003B8PPEY/ref=ox_sc_act_title_3?ie=UTF8&m=ATVPDKIKX0DER Western Digital 1 TB bus-powered external hard drives] via Amazon ($79.99 each) for video storage & backup. | * Ordered 2 [http://www.amazon.com/gp/product/B003B8PPEY/ref=ox_sc_act_title_3?ie=UTF8&m=ATVPDKIKX0DER Western Digital 1 TB bus-powered external hard drives] via Amazon ($79.99 each) for video storage & backup. | ||
''2011-10-13'' | |||
* Began editing Soldering Video | |||
* B-Roll for Controller Box Video | |||
* Concrete Forms | |||
''2011-10-14'' | |||
''2011-10-15'' | |||
''2011-10-16'' | |||
* Shot, edited & published TrueFans Update - http://vimeo.com/30660860 | |||
''2011-10-17'' | |||
* Re-compressed TrueFans Update with correct sequence settings | |||
* Picked Up Wood-Burning Stove | |||
''2011-10-18'' | |||
''2011-10-19'' | |||
* P/U'd hard drives from Post Office | |||
''2011-10-20'' | |||
* Cleaned Kitchen | |||
==General Notes== | ==General Notes== |
Revision as of 18:04, 20 October 2011
Log
2011-10-12
- Ordered 2 Western Digital 1 TB bus-powered external hard drives via Amazon ($79.99 each) for video storage & backup.
2011-10-13
- Began editing Soldering Video
- B-Roll for Controller Box Video
- Concrete Forms
2011-10-14
2011-10-15 2011-10-16
- Shot, edited & published TrueFans Update - http://vimeo.com/30660860
2011-10-17
- Re-compressed TrueFans Update with correct sequence settings
- Picked Up Wood-Burning Stove
2011-10-18
2011-10-19
- P/U'd hard drives from Post Office
2011-10-20
- Cleaned Kitchen
General Notes
- Convert all footage in compressor to apple prores, 29.97fps
- Try to think in steps
To Do
- Figure out workflow
- Research uploading video to archive.org for ease of crowd-sourced video editing
Dream
List of videos from Ian:
- Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
- Fabrication steps for soil loading drawer
- Edit of assembly procedure for entire frame, starting from components
- Building hopper shaker assembly
- Building of hopper superstructure and connection to frame
- Asembly and function of cylinder ajusters: forward, side to side, and drawer adjusters
- Documentation of CEB machine dimensions, piece by piece
- Hydrauilics hookup and operation procedure
- Brick pressing sequence explanation
10. Sawmill: operation procedures from existing footage 11. Tractor: wheel attachment procedure 12. Tractor: loader mounting procedure 13. Power Cube: overall assembly procedure starting from raw parts 14. Soil pulverizer: overall assembly procedure 15. Power Cube: wiring walkthrough 16. CEB press: field operating procedure from setup to bricks pressed
Done
About