User:Rrrojer: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 2: Line 2:
''2011-10-12''
''2011-10-12''
* Ordered 2 [http://www.amazon.com/gp/product/B003B8PPEY/ref=ox_sc_act_title_3?ie=UTF8&m=ATVPDKIKX0DER Western Digital 1 TB bus-powered external hard drives] via Amazon ($79.99 each) for video storage & backup.
* Ordered 2 [http://www.amazon.com/gp/product/B003B8PPEY/ref=ox_sc_act_title_3?ie=UTF8&m=ATVPDKIKX0DER Western Digital 1 TB bus-powered external hard drives] via Amazon ($79.99 each) for video storage & backup.
''2011-10-13''
* Began editing Soldering Video
* B-Roll for Controller Box Video
* Concrete Forms
''2011-10-14''


''2011-10-15''
''2011-10-16''
* Shot, edited & published TrueFans Update - http://vimeo.com/30660860
''2011-10-17''
* Re-compressed TrueFans Update with correct sequence settings
* Picked Up Wood-Burning Stove
''2011-10-18''
''2011-10-19''
* P/U'd hard drives from Post Office
''2011-10-20''
* Cleaned Kitchen


==General Notes==
==General Notes==

Revision as of 18:04, 20 October 2011

Log

2011-10-12

2011-10-13

  • Began editing Soldering Video
  • B-Roll for Controller Box Video
  • Concrete Forms

2011-10-14

2011-10-15 2011-10-16

2011-10-17

  • Re-compressed TrueFans Update with correct sequence settings
  • Picked Up Wood-Burning Stove

2011-10-18

2011-10-19

  • P/U'd hard drives from Post Office

2011-10-20

  • Cleaned Kitchen

General Notes

  • Convert all footage in compressor to apple prores, 29.97fps
  • Try to think in steps

To Do

  • Figure out workflow
  • Research uploading video to archive.org for ease of crowd-sourced video editing


Dream

List of videos from Ian:

  1. Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
  2. Fabrication steps for soil loading drawer
  3. Edit of assembly procedure for entire frame, starting from components
  4. Building hopper shaker assembly
  5. Building of hopper superstructure and connection to frame
  6. Asembly and function of cylinder ajusters: forward, side to side, and drawer adjusters
  7. Documentation of CEB machine dimensions, piece by piece
  8. Hydrauilics hookup and operation procedure
  9. Brick pressing sequence explanation

10. Sawmill: operation procedures from existing footage 11. Tractor: wheel attachment procedure 12. Tractor: loader mounting procedure 13. Power Cube: overall assembly procedure starting from raw parts 14. Soil pulverizer: overall assembly procedure 15. Power Cube: wiring walkthrough 16. CEB press: field operating procedure from setup to bricks pressed

Done

About