Mike Log: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{{RightTOC}} ==Notes on My OSE Objectives== * I'm currently onsite at FeF! * My goal is to help get all the CAD models and drawings out by December 25th ==November 14, 2011 - Th...") |
|||
Line 7: | Line 7: | ||
* Further progress on the Liberator CEB Press today. Got a really nice parametric model of the hopper so that we can dynamically change all the angles and sides so that we can optimize the shape and size. | * Further progress on the Liberator CEB Press today. Got a really nice parametric model of the hopper so that we can dynamically change all the angles and sides so that we can optimize the shape and size. | ||
* I'm modeling most of the press as it is now that is prototyped, but am hopefully implementing a change to close off the gaps between the hopper and | * I'm modeling most of the press as it is now that is prototyped, but am hopefully implementing a change to close off the gaps between the hopper and the soil loading drawer as well as clean up some of the hole locations and fits. | ||
* Hopefully recruiting some CAD help for the drawings soon! | * Hopefully recruiting some CAD help for the drawings soon! |
Revision as of 02:17, 15 November 2011
Notes on My OSE Objectives
- I'm currently onsite at FeF!
- My goal is to help get all the CAD models and drawings out by December 25th
November 14, 2011 - Thursday
- Further progress on the Liberator CEB Press today. Got a really nice parametric model of the hopper so that we can dynamically change all the angles and sides so that we can optimize the shape and size.
- I'm modeling most of the press as it is now that is prototyped, but am hopefully implementing a change to close off the gaps between the hopper and the soil loading drawer as well as clean up some of the hole locations and fits.
- Hopefully recruiting some CAD help for the drawings soon!