Cold Saw/Build Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 2: Line 2:


*Lathe the Base Disc. Measure, mark, and pilot drill the Base Disc.
*Lathe the Base Disc. Measure, mark, and pilot drill the Base Disc.
*Pilot drill 1 of the 4 holes on the Base Plate and 1 of the 4 mount holes on the Fixed Block.


*Match pilot drill the Base Plate through the Base Disc.
*Match pilot drill the Base Plate through the Base Disc.
Line 11: Line 9:
*Drill the Base Plate.
*Drill the Base Plate.


*Measure, mark, pilot drill, and drill the axis holes on the Fixed Block.
*Drill the Fixed Block mount holes. Measure, mark, pilot drill, and drill the axis holes on the Fixed Block.


=Vise Assembly=
=Vise Assembly=

Revision as of 00:03, 9 June 2012

Steps

  • Lathe the Base Disc. Measure, mark, and pilot drill the Base Disc.
  • Match pilot drill the Base Plate through the Base Disc.
  • Match pilot drill the Fixed Block through the Base Disc.
  • Drill the Base Plate.
  • Drill the Fixed Block mount holes. Measure, mark, pilot drill, and drill the axis holes on the Fixed Block.

Vise Assembly

  • Clamp Blocks onto Moving Blocks: Tack weld + weld the Clamp Blocks onto the Moving Blocks, then surface grind the clamping face of the Clamp Blocks such that their clamping faces are parallel. Then drill the Jaw holes through the Clamp Blocks.
  • Threaded Rod and Nuts: Position the Moving Block such that the Threaded Rod can be inserted vertically. Insert the Threaded Rod, then fasten the Nut onto the threaded rod such that the nut contacts the Moving Block. Center the nut approximately then tack weld + weld the nut onto the Moving Block.