== 31 july 2012 == | == 31 july 2012 == | ||
Today we all did some practice in torching pieces. Actually we tried to make a table and we did practice together. Our teacher was small | Today we all did some practice in torching pieces. Actually we tried to make a table and we did practice together. Our teacher was small George and Aidan. We do this kind of staff today because tomorrow we will start finally to build our trencher. We are all enthusiastic and we were waiting for this moment. Also today we did a house meeting and from now on we can’t see movies after 11 o’clock at night because of the voice. They put that rule into force because yesterday we saw a movie late at night although the voice was almost off we couldn’t hear anything. In the kitchen at morning we had a bad surprise someone had put all the dirty dishes spoons ect. together with the clean one. It was a little disaster but it didn’t were a big deal. | ||
== 30 july 2012 == | == 30 july 2012 == | ||
Today first me and small George (Adamerimnos) and after Theo joint us we help Marcin to fill the roof with straw also we put some white ash in the roof. Marcin told us that ash is to keep away mouses and other small animals. Also I did some practice on cad and | Today first me and small George (Adamerimnos) and after Theo joint us, we help Marcin to fill the roof with straw also we put some white ash in the roof. Marcin told us that ash is to keep away mouses and other small animals. Also I did some practice on cad and designed some parts of [http://opensourceecology.org/wiki/Trencher trencher]. | ||
Revision as of 13:35, 1 August 2012
31 july 2012
Today we all did some practice in torching pieces. Actually we tried to make a table and we did practice together. Our teacher was small George and Aidan. We do this kind of staff today because tomorrow we will start finally to build our trencher. We are all enthusiastic and we were waiting for this moment. Also today we did a house meeting and from now on we can’t see movies after 11 o’clock at night because of the voice. They put that rule into force because yesterday we saw a movie late at night although the voice was almost off we couldn’t hear anything. In the kitchen at morning we had a bad surprise someone had put all the dirty dishes spoons ect. together with the clean one. It was a little disaster but it didn’t were a big deal.
30 july 2012
Today first me and small George (Adamerimnos) and after Theo joint us, we help Marcin to fill the roof with straw also we put some white ash in the roof. Marcin told us that ash is to keep away mouses and other small animals. Also I did some practice on cad and designed some parts of trencher.
29 july 2012
Today is SMALL GEORGE's BIRTHDAY. So we didn’t do many thinks about the trencher. We actually wanted to make a party for small and big George (because we hadn't done any party on his birthday). We went to the shop and bought candies, a lot of meat and a big cake. It was perfect. We had music we danced we sang Greek folk songs, it was very nice. I found some time and I went to the lake there I found Gabi, Graham, the new guy and Aidan. It was my first time that I saw all these people to go swimming and it was funny.
28 july 2012
Today we downloaded the cad; now I can use it and make some designs of the trencher. It is not the cad that I used to use so it will take me a little time to become familiar with it. Also me and big George (Kakaris) we helped Aidan to move some marble slab. It was really hard because the only tool that we could use were 2 metal beams. Also today we had a new arrival a new guy.
27 july 2012
Today I can happily say that my injuries didn’t hurt me at all. Today I continued my practice on google sketch up 8. Also I went to the lake and I did some swim-training. In the lake also I found Theo sleeping on the platform
26 july 2012
My injuries from yesterday hurt me when I walk but it’s not a big deal. Today we finished the the design of the steps about how to build the machine. Also I did some practice on Google sketch up 8
25 july 2012
Today me and Theodosis we went to the lake for swimming. Today I was extremely unlucky. A little piece of wood got into my foot twice so I can’t walk so easily but never mind. Also today we talked with Marcin about the «teeth» of the Trencher.And we finished the steps how to make the spensher.
24 July 2012
Today we had a meeting with one person of each team that will give the status of the team progress. In our team this person is Theodosis. Also we have almost completed the 3D design of our machine and we started searching for materials to build our machine. Also today, Alex talked to us about Permaculture. I didn't understand all of it but it sounds really interesting.
23 July 2012
Today in the morning we skyped with Mrs G. Proestopoulos (our counselor). Also we had a meeting with Marcin. In the meeting we were assigned a new project. From now on we will be responsible to build an open source Trencher. With Marcin we talked about the main idea.We started the design at night. Also, I found some time to go swimming and I found Theodosis at the lake. Late at night we helped Aidan to move some power cube and, trust me they are really heavy!
22 July 2012
On Sundays we take a break from the week's work. So we didn't do any kind of work. At night we played football and watched a movie.
17 July
There is a slowdown on the work we do here. I guess we need more guidance in our work. The whole concept of open source ecology is fascinating, but real life and effort can be very hard. Our spirit not very high, but I want to do and understand more of what is happening here. Besides our planet is transforming and whole this can be a driving force for the future.
12 July
My early morning wake up that I am used to gives me the opportunity to exercise by running round the farm. Theo and George are into Arduino.
9 July 2012
Me and Theo worked on the sawmill plans. Before SolidWorks we measured the dimensions.
5 July 2012
We started learning SolidWorks. Yoonseo showed us some basic stuff and proposed some videos on youtube. I haven't worked much 3D CAD in the past and it looks quite different from the DraftSight and AutoCAD I have used. It is impressive.
4 July 2012
Today we helped Brianna on installing power infrastructure in the HabLab before the daily scrum.
3 July 2012
Initial adjustment and farming work. Also I assisted Matthew Schwabauer build the ceiling of HabLab and installed metal ceiling panels. This also included stuffing the space with straw and a sprinkling of borax to deter critters. Picture ceiling installation
2 July 2012
Arrival at the farm. Setting up of the tents in which we will sleep.
1 July 2012
Stuck in Chicagο on the way to the farm due to customs delays. Nice opportunity to see the city along with George A. and George K. Upon returning to our the hotel we ended up in a hotel with a similar name. We managed to return on our own and enjoy the unexpected visit.
Preparation
Before our departure I edited the our presentation video for Marcin and his team.