Jacob Dalton Log: Difference between revisions
Jacob Dalton (talk | contribs) No edit summary |
Jacob Dalton (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
=Sat November 24, 2012= | |||
Collaborative Production Run Day 2. Worked on aligning primary and secondary and secondary arms of frame. Problems with documentation lead to retorching the holes. Lots of band saw cutting. Lots of lifting and moving things. Worked on one of the vertical plates in the compression chamber. Swept out half of the workshop. | Collaborative Production Run Day 2. Worked on aligning primary and secondary and secondary arms of frame. Problems with documentation lead to retorching the holes. Lots of band saw cutting. Lots of lifting and moving things. Worked on one of the vertical plates in the compression chamber. Swept out half of the workshop. | ||
=Fri November 23, 2012= | |||
Collaborative Production Run Day 1. Setup welder. Did lots of grinding on hopper and primary arms. Hole punched box alignment pieces. Ran band saw and iron worker. Did some mag drilling. Welded u channel nuts on u-channel. | Collaborative Production Run Day 1. Setup welder. Did lots of grinding on hopper and primary arms. Hole punched box alignment pieces. Ran band saw and iron worker. Did some mag drilling. Welded u channel nuts on u-channel. | ||
=Thur November 22, 2012= | |||
Beautiful day -- tidied up a bit in front of hablab (organized pallets, wood, irrigation hose) and started to grade area for insulation apron. Kavitha made an excellent Thanksgiving dinner. True Fans App: More feedback emails (BTC and another testing volunteer - Emily). Started facebook integration. Made slightly less progress than hoped but preliminary integration is up on test server--need to create an interface now. Need to do some backend work to generate adequate meta tags for facebook actions. I expect facebook integration to take one more day, but I could easily hit a snag on the meta tags so I'd plan a day and a half +/- half a day. Afterwards: 1) scripts/teleprompting, 2) twitter, and 3) playlists. | Beautiful day -- tidied up a bit in front of hablab (organized pallets, wood, irrigation hose) and started to grade area for insulation apron. Kavitha made an excellent Thanksgiving dinner. True Fans App: More feedback emails (BTC and another testing volunteer - Emily). Started facebook integration. Made slightly less progress than hoped but preliminary integration is up on test server--need to create an interface now. Need to do some backend work to generate adequate meta tags for facebook actions. I expect facebook integration to take one more day, but I could easily hit a snag on the meta tags so I'd plan a day and a half +/- half a day. Afterwards: 1) scripts/teleprompting, 2) twitter, and 3) playlists. | ||
=Wed November 21, 2012= | |||
Met with Marcin. Attended team meeting. Toured farm (extra work oppurtunities-insulation apron and light screen). Made dinner. True Fans App: sent some feedback emails (to Chuck and Matt). Usability improvements -- upload page no longer has optional inputs visible by default, it's impossible to double submit the form, and changed viewing location of status messages on upload page. Plan to work on facebook integration tomorrow. | Met with Marcin. Attended team meeting. Toured farm (extra work oppurtunities-insulation apron and light screen). Made dinner. True Fans App: sent some feedback emails (to Chuck and Matt). Usability improvements -- upload page no longer has optional inputs visible by default, it's impossible to double submit the form, and changed viewing location of status messages on upload page. Plan to work on facebook integration tomorrow. | ||
=Tues November 20, 2012= | |||
Arrived at FeF. No issues driving. Set up room and ready to go. Meeting tomorrow with Marcin. | Arrived at FeF. No issues driving. Set up room and ready to go. Meeting tomorrow with Marcin. | ||
'''[[True Fans Microfunding App]]''' |
Revision as of 01:23, 26 November 2012
Sat November 24, 2012
Collaborative Production Run Day 2. Worked on aligning primary and secondary and secondary arms of frame. Problems with documentation lead to retorching the holes. Lots of band saw cutting. Lots of lifting and moving things. Worked on one of the vertical plates in the compression chamber. Swept out half of the workshop.
Fri November 23, 2012
Collaborative Production Run Day 1. Setup welder. Did lots of grinding on hopper and primary arms. Hole punched box alignment pieces. Ran band saw and iron worker. Did some mag drilling. Welded u channel nuts on u-channel.
Thur November 22, 2012
Beautiful day -- tidied up a bit in front of hablab (organized pallets, wood, irrigation hose) and started to grade area for insulation apron. Kavitha made an excellent Thanksgiving dinner. True Fans App: More feedback emails (BTC and another testing volunteer - Emily). Started facebook integration. Made slightly less progress than hoped but preliminary integration is up on test server--need to create an interface now. Need to do some backend work to generate adequate meta tags for facebook actions. I expect facebook integration to take one more day, but I could easily hit a snag on the meta tags so I'd plan a day and a half +/- half a day. Afterwards: 1) scripts/teleprompting, 2) twitter, and 3) playlists.
Wed November 21, 2012
Met with Marcin. Attended team meeting. Toured farm (extra work oppurtunities-insulation apron and light screen). Made dinner. True Fans App: sent some feedback emails (to Chuck and Matt). Usability improvements -- upload page no longer has optional inputs visible by default, it's impossible to double submit the form, and changed viewing location of status messages on upload page. Plan to work on facebook integration tomorrow.
Tues November 20, 2012
Arrived at FeF. No issues driving. Set up room and ready to go. Meeting tomorrow with Marcin.