Miguel Log: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
==02013== | ==02013== | ||
===DPV Experience July 15th-TBD=== | ===DPV Experience July 15th-TBD=== | ||
====Week 30:July 21-27==== | |||
*M | |||
====Week 29:July 14-20==== | ====Week 29:July 14-20==== | ||
*Mon/15 | *Mon/15 | ||
Line 32: | Line 34: | ||
:1700-1730:LT5 DPV team, Spark documentary team, and contributing DPV photo with LT5 | :1700-1730:LT5 DPV team, Spark documentary team, and contributing DPV photo with LT5 | ||
:1730-1800:LT5 departure | :1730-1800:LT5 departure | ||
:1800-2300:Voluntarily conducted individual deep clean of entire bathroom to include showers, toilets, sink area, plastic storage drawers, and vacuumed |
Revision as of 04:17, 30 July 2013
02013
DPV Experience July 15th-TBD
Week 30:July 21-27
- M
Week 29:July 14-20
- Mon/15
- 0830-Arrived at FeF
- 0900-0930:Morning meeting/discussed tasks to be completed with the LifeTrac 5(LT5) fabrication that was currently in Progress
- 0930-1200:Worked on fabricating LT5
- 1200-1230:Lunch
- 1230-2200:Continued working on LT5 fabrication
- Tue/16
- 0900-0930:Morning meeting/discussed tasks to be completed with the LifeTrac 5(LT5) fabrication
- 0930-1230:Worked on fabricating LT5
- 1230-1300:Lunch
- 1300-2100:Continued Working on fabricating LT5
- Wed/17
- 0900-0930:Morning meeting/discussed tasks to be completed with the LifeTrac 5(LT5) fabrication
- 0930-1130:Worked on fabricating LT5
- 1130-1200:Lunch
- 1200-1400:rest
- 1400-2200:Continued working on fabricating LT5
- Thu/18
- 0900-0930:Morning meeting/discussed tasks to complete the LifeTrac 5(LT5) fabrication
- 0930-1200:Worked on fabricating LT5
- 1200-1230:Lunch
- 1230-2200:Completed fabricating the LT5, Fabricated/used die 7/16-20 die to thread new jowstick for LT5, had to grind down diameter of recycled joystick
- Fri/19
- 0900-1200:Observed repairs of hydraulic leak/field test of LT5
- 1200-1230:Lunch
- 1230-1330:Observed first attempt to load LT5 on trailer/observed it almost falling off trailer due to wrong tyoe of hydraulic cylinder for articulating steering/observed successful to recovery to try loading again
- 1330-1500:rest/troubleshoot solutions
- 1500-1700:Other DPVS and Onsite contributers succesfully troubleshot loading problem by switching hoses to enable more controlled steering onto trailer and they loaded LT5 onto trailer
- 1700-1730:LT5 DPV team, Spark documentary team, and contributing DPV photo with LT5
- 1730-1800:LT5 departure
- 1800-2300:Voluntarily conducted individual deep clean of entire bathroom to include showers, toilets, sink area, plastic storage drawers, and vacuumed