James Slade Log: Difference between revisions
Jump to navigation
Jump to search
James Slade (talk | contribs) No edit summary |
James Slade (talk | contribs) |
||
Line 3: | Line 3: | ||
Sitting down and looking into PCB design for the CEB's. These will be professionally made to save time and also designed to be robust enough for outdoor, all weather use. | Sitting down and looking into PCB design for the CEB's. These will be professionally made to save time and also designed to be robust enough for outdoor, all weather use. | ||
2 hours | |||
=Saturday 3 2013= | =Saturday 3 2013= |
Revision as of 23:57, 4 August 2013
Sunday 4 2013
PCB designs
Sitting down and looking into PCB design for the CEB's. These will be professionally made to save time and also designed to be robust enough for outdoor, all weather use.
2 hours
Saturday 3 2013
Log Start
- Evaluate current requests from FeF and determine cost, time, and workflow
- Setup Log
Had a late day getting started as there were unexpected issues here in moving my truck from Creation Flame to a shop in town. This will become 1983 Chevy Blazer 6.2 diesel mobile 4x4 power cube with a turbo. :)