Kyle log: Difference between revisions
Jump to navigation
Jump to search
Kyle Ritchie (talk | contribs) |
Kyle Ritchie (talk | contribs) |
||
Line 2: | Line 2: | ||
*Reference to MicroHouse | *Reference to MicroHouse | ||
http://opensourceecology.org/wiki/MicroHouse_Collaboration_2014 | http://opensourceecology.org/wiki/MicroHouse_Collaboration_2014 | ||
*Critically considering alternative framing process than enables both earth-brick stacking and continuous roof framing | *Critically considering alternative framing process than enables both earth-brick stacking and continuous roof framing simultaneous | ||
- while ensuring | - while ensuring | ||
1) Safety of all workers | 1) Safety of all workers |
Revision as of 18:30, 9 March 2014
Sunday, March 9
- Reference to MicroHouse
http://opensourceecology.org/wiki/MicroHouse_Collaboration_2014
- Critically considering alternative framing process than enables both earth-brick stacking and continuous roof framing simultaneous
- while ensuring 1) Safety of all workers 2) Quality of roof 3) Speed of construction