Shane Log: Difference between revisions
S Oberloier (talk | contribs) No edit summary |
S Oberloier (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
Welcome! Shane's blog - [http://www.voltfolio.com/main/content/pcb-design-workshop] | Welcome! Shane's blog - [http://www.voltfolio.com/main/content/pcb-design-workshop] | ||
=Thu Jul 6 2017= | |||
[http://voltfolio.com/main/content/ose-d3d-circuit-mill-steps-mm-calibration OSE D3D Circuit Mill: Steps per mm Calibration] | |||
=Tue Jun 20 2017= | =Tue Jun 20 2017= | ||
Assembled all axes for CNC router | Assembled all axes for CNC router |
Revision as of 23:06, 6 July 2017
Welcome! Shane's blog - [1]
Thu Jul 6 2017
OSE D3D Circuit Mill: Steps per mm Calibration
Tue Jun 20 2017
Assembled all axes for CNC router
Mon Mar 13 2017
Began Programming, and Assembly Reference for programming ATTiny
Tues Mar 7 2017
Design Simplification. Simulations complete. Made Parts Table. Ordered Components for first test run.
Fri Feb 24, 2017
Finished Method section of paper. Started milling boards. Ordered parts. Fixed PCB leveling software. Fixed PCB mill issue
Fri Feb 17, 2017
Meeting with Marcin. Sensor Node Designed.
Op-Amp Video
Relevant Links from Discussion:
- Blender Video Sequence Editor (VSE)
- KiCAD Tutorial
- Quite Universal Circuit Simulator (Qucs)
- Open Broadcaster Software
Tue Jan 24, 2017
Researching feasibility of two wire interface (TWI) for communications. Taking a look at current sensor options. Drafting system system hub, and overall system
Tue Jan 22, 2017
Working on Literature review
Tue Jan 17, 2017
Photovoltaics class - discuss project goals with Dr. Pearce. Concept drawing for universal sensor node.
Fri Jan 13, 2017