Africa Budget: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "To replicate a microfactory in Africa as of 2018 would require the following over 3 years: '''Year 1''' *7 full time engineers @ $100k/yr - $700k *OSE Fellows Tuition x3 - $19...")
 
No edit summary
Line 1: Line 1:
To replicate a microfactory in Africa as of 2018 would require the following over 3 years:
To replicate a heavy machine production digital microfactory in Africa as of 2018 would require the following over 3 years:
'''Year 1'''
'''Year 1'''
*7 full time engineers @ $100k/yr - $700k
*7 full time engineers @ $100k/yr - $700k
Line 10: Line 10:


*Travel x4, 2x per year, $2k a pop - $32k
*Travel x4, 2x per year, $2k a pop - $32k
*Open Source Equipment (tractor, dozer, backhoe, CEB, mixer, gasifier, CNC torch, CNC multimachine, oxyhydrogen, gasifier, charcoal maker - $100k
*Open Source Equipment (tractor, dozer, backhoe, CEB, mixer, gasifier, CNC torch, CNC multimachine, oxyhydrogen, gasifier, charcoal maker + BOS) - $100k
*Open Source Facility (4000 sf, off grid PV + nickel iron batteries, CEB structure) - $100k
*Open Source Facility (4000 sf, off grid PV + nickel iron batteries, CEB structure + BOS) - $100k
*Transport - 2 containers - $20k
*Transport - 2 containers - $20k
*Staff + admin, 3 years - $125k
*Staff + admin, 3 years - $125k

Revision as of 17:28, 25 May 2018

To replicate a heavy machine production digital microfactory in Africa as of 2018 would require the following over 3 years: Year 1

  • 7 full time engineers @ $100k/yr - $700k
  • OSE Fellows Tuition x3 - $19.5k
  • Fellows Stipend x3 @$4k/mo - $150k

Subtotal - $870k

Year 2-3

  • Travel x4, 2x per year, $2k a pop - $32k
  • Open Source Equipment (tractor, dozer, backhoe, CEB, mixer, gasifier, CNC torch, CNC multimachine, oxyhydrogen, gasifier, charcoal maker + BOS) - $100k
  • Open Source Facility (4000 sf, off grid PV + nickel iron batteries, CEB structure + BOS) - $100k
  • Transport - 2 containers - $20k
  • Staff + admin, 3 years - $125k
  • OSE Fellows Tuition x3 - $19.5k
  • Fellows Stipend x3 @$6k/mo - $360k
  • Land, 40 acres (donated)

Subtotal - $757k

Total - $1.6M