== Technical Review ==  | == Technical Review ==  | ||
=== Frame ===  | === Frame ===  | ||
* Time spent: 2hrs    | * Time spent: 2hrs, 1 instructor  | ||
* Extra time spent: 45mins, 1 instructor working  | |||
* Improvement: Epoxy frames need prepped 48 hours in advance  | * Improvement: Epoxy frames need prepped 48 hours in advance  | ||
* Consider: printing thingyverse epoxy-application-tool and using for more even application  | |||
* Order: 0 -- was done before the build, not during.  | |||
* Because it fell apart, spent 30-45mins deciding what to do about it and drilling holes into Alex's welded frame  | |||
===   | === Axes ===    | ||
* Time Spent: 1.5 hours 1 novice & 1 instructor working, 2 axes  | |||
* Time Spent: 1 hour, 4 people working  | |||
===  Heated Bed ===    | ===  Heated Bed ===    | ||
| Line 12: | Line 18: | ||
===  Control Panel ===    | ===  Control Panel ===    | ||
*   | |||
===  Assembly & First Print ===    | ===  Assembly & First Print ===    | ||
Revision as of 18:55, 29 October 2018
Technical Review
Frame
- Time spent: 2hrs, 1 instructor
 - Extra time spent: 45mins, 1 instructor working
 - Improvement: Epoxy frames need prepped 48 hours in advance
 - Consider: printing thingyverse epoxy-application-tool and using for more even application
 - Order: 0 -- was done before the build, not during.
 - Because it fell apart, spent 30-45mins deciding what to do about it and drilling holes into Alex's welded frame
 
Axes
- Time Spent: 1.5 hours 1 novice & 1 instructor working, 2 axes
 - Time Spent: 1 hour, 4 people working
 
Heated Bed
Extruder
* Use bolt cutter for cutting rods
Control Panel
Assembly & First Print
Cable Chain + Final Touches
Accessbility Improvement Recommendations
Sat Oct 27, 2018 Oakland 1-day Build
- Keep the build phase concept. It works.
 - Keep quality control checks. It works.
 - Need an identification survey: what type of xp are they coming with?
 - Need an exit survey.
 - Reduce the number of questions on a per-build phase. Have this be a verbal check-in. And input it on their behalf.
 - Switch to having a more in-depth module-based survey.
 - Add an "Newbie Intervention" motivation convo. Folks paralyzed by "I don't know what I don't know" -- need to explicitly dispel this myth. If you can explain it, then you know it. There's not "more to it" ... those are different skills.
 - Attempt to go WITHOUT doing an in-person demo? to speed up the process. Let there be videos instead, and just a quick overview. People kinda hate reading. Try this just for the axis build and see how it goes.
 - Enforce opening up the manual at your workstation. Better setup workstations. folks had tendency to "just go for it" and not read at all or use reference material at all.
 - add Build Phases for the Extruder, especially QC to prevent issues like in this build.
 - add a "time it" component to the workflow
 
Observations
Sat Oct 27, 2018 Oakland 1-day Build
Deidre
- Deidre left fter 4 hours
- they were tired in the mornign to start
 - tried to stay longer, waiting for a 2nd wind
 - was super motivated, but couldn't go on.
 - came from sacramento, pretty far away
 
 - had shifting interests... may buy other makery things first
 - came to investigate the 3d printer
 - still a little unclear about what people would want to do with a 3d printer
 
Matthew
- ran out of steam in about 4 hours
 - arrived at 1pm
 - works in dentist profession, wants 3d printing before they bring it into office
 - this could be a growing market, ask for referrals here
 - as opposed to deidre, main goal seemed to be just getting a 3d printer, vs. understanding all aspects of the build
 - was confident that if something went wrong later, they could refer to the manual
 - was experienced w/ building things, like building guitars as their hobby
 - was under the impression taht workshop would end at 5pm, so had a "let's rush this" approach to doing all the builds
 - was less interested in learning the intricacies of how all parts worked bc they already understood it well enough
 
Feelings
Sat Oct 27, 2018 Oakland 1-day Build
- I have mixed feelings about Deirdre's xp. They could have had a better xp I believe.
 - I have good feelings about Matthew's xp. Probably close to as good as it gets given circumstances.