Talk:CEB Press Build Instructions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
The technical drawing repository is at the [http://openpario.mime.oregonstate.edu/projects/oseceb/documents Open+Pario] project management site. | The technical drawing repository is at the [http://openpario.mime.oregonstate.edu/projects/oseceb/documents Open+Pario] project management site. | ||
*Electrical System | |||
*Plans | |||
**Fabrication Drawings | |||
**CAD Drawings | |||
**3D Modeling | |||
**Exploded Part Drawings | |||
**Tooling | |||
**Fabrication Ergonomics |
Revision as of 23:52, 25 February 2011
The design evolution for the prototype is documented at Worknets. The relevant technical drawings that we have to date are here.
The technical drawing repository is at the Open+Pario project management site.
- Electrical System
- Plans
- Fabrication Drawings
- CAD Drawings
- 3D Modeling
- Exploded Part Drawings
- Tooling
- Fabrication Ergonomics