Transcription Suggestions CEB Microhouse Build in Belize: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
== Introduction == | == Introduction == | ||
After the CEB Microhouse Build in Belize, all participants took some time to write down general feedback. These feedback forms have been transcribed and consolidated in [[Consolidation | After the CEB Microhouse Build in Belize, all participants took some time to write down general feedback. These feedback forms have been transcribed and consolidated in [[Consolidation Suggestions CEB Microhouse Build in Belize]]. This document contains the transcription of the feedback forms. | ||
== Feedback form 1 == | |||
* Defined plans which can be followed | |||
* consideration of the equipment inventory | |||
Use checklist manifesto for maximizing build | |||
People who are building their 1st house need a full list it equipment and materials and tools | |||
Prepare people of what is expected of them | |||
Provide resources so those w/o required skills can get them | |||
Allow more time with rest periods | |||
tool and equipment inventory |
Revision as of 20:43, 7 March 2020
Introduction
After the CEB Microhouse Build in Belize, all participants took some time to write down general feedback. These feedback forms have been transcribed and consolidated in Consolidation Suggestions CEB Microhouse Build in Belize. This document contains the transcription of the feedback forms.
Feedback form 1
- Defined plans which can be followed
- consideration of the equipment inventory
Use checklist manifesto for maximizing build People who are building their 1st house need a full list it equipment and materials and tools
Prepare people of what is expected of them Provide resources so those w/o required skills can get them
Allow more time with rest periods
tool and equipment inventory