CEB Press/Manufacturing Instructions/Frame with main cylinder: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
== Diagram and video explantion == | == Diagram and video explantion == | ||
This diagram shows the pieces needed for the frame. Click to enlarge: | |||
[[Image:feflibframe.jpg|400px]] | [[Image:feflibframe.jpg|400px]] | ||
Line 19: | Line 19: | ||
== Fabrication Steps == | == Fabrication Steps == | ||
===Step 1: Cut pieces=== | ===Step 1: Cut pieces=== | ||
[[Image:channel.jpg|thumb|Step 1. Torch or cold-cut channel to size]] | |||
Cut the following pieces: | |||
*2 pieces, 40 3/4" | *2 pieces, 40 3/4" | ||
*4 pieces, 18" | *4 pieces, 18" | ||
*2 pieces, 26" | *2 pieces, 26" | ||
*2 pieces 1/4”x10”x18” (bent 1.5” off the edge the long way) | *2 pieces 1/4”x10”x18” (bent 1.5” off the edge the long way) | ||
Revision as of 19:56, 24 April 2011
Tools Required
- torch
- hole punch
Materials Required
- 6 inch heavy (7/16") u-channel - ( 20 ft )
- bolts
- 3”x3”x1/2” (8) (cylinder mounts for both cylinders)
- 1” shaft, 6” long (main cylinder mount)
Diagram and video explantion
This diagram shows the pieces needed for the frame. Click to enlarge:
Fabrication Steps
Step 1: Cut pieces
Cut the following pieces:
- 2 pieces, 40 3/4"
- 4 pieces, 18"
- 2 pieces, 26"
- 2 pieces 1/4”x10”x18” (bent 1.5” off the edge the long way)