CEB Press/Manufacturing Instructions/Soil loading drawer: Difference between revisions
Jump to navigation
Jump to search
William Neal (talk | contribs) No edit summary |
William Neal (talk | contribs) No edit summary |
||
Line 18: | Line 18: | ||
<html><h3>Drawer Assembly Step 1</h3></html> | <html><h3>Drawer Assembly Step 1</h3></html> | ||
[[File:Assemble_Drawer_1.jpg|200px|Assemble Drawer 1]] | [[File:Assemble_Drawer_1.jpg|200px|Assemble Drawer 1]] | ||
<html><h3>Drawer Assembly | <html><h3>Drawer Assembly Steps 2-4</h3></html> | ||
[[File:Assemble_Drawer_2.jpg|200px|Assemble_Drawer 2]] | [[File:Assemble_Drawer_2.jpg|200px|Assemble_Drawer 2]] | ||
Revision as of 19:21, 18 August 2011
Main > Housing and construction > CEB Press > CEB press building instructions
Tools Required
Materials Required
ID | Quant | Type | Length | Total | Name | Detail |
Diagrams
Drawer Parts
Drawer Assembly Step 1
Drawer Assembly Steps 2-4
Fabrication Steps
(note: part numbers refer to the recently-published parts list on the Bill of Materials page)
- Line up the Inner and Outer Rails (S27, S28) and clamp them together with vise grips.
- Clamp the Sides (S29), Press Plate (S26), Tube (S24), Roof(S25) and Back (S22) and the rails together with vise-grips and C-Clamps.
- Tack weld the clamped drawer at a few locations down to prevent warping when it is welded together.
- Complete the welding joints, welding at different locations as you go to prevent warping.
- Check the completed drawer to ensure that it is still straight.
- If they are not straight, the rails may need to be adjusted to ensure that the bearings will roll fit them correctly; if the drawer is not even and aligned, it may not fit properly in the frame.
- Weld the Cylinder Tongue (S23) to the centre of the Back (S22) of the Drawer.