== Fabrication Steps ==
== Fabrication Steps ==
(note: part numbers refer to the recently-published parts list on the Bill of Materials page)
(note: part numbers refer to the recently-published parts list on the Bill of Materials page)
# Line up the Inner and Outer Rails (S27, S28) and clamp them together with vise grips.
# Weld the Tube (S42) on the Press Plate (S26) so that it lines up with one edge of the Press Plate and the Press Plate extends 1" beyond the other side
# Clamp the Sides (S29), Press Plate (S26), Tube (S24), Roof(S25) and Back (S22) and the rails together with vise-grips and C-Clamps.
# Clamp the Sides (S29) on the ends of the tube as shown.
# Clamp the Back between the extended ends of the Sides (S29)
# Clamp the Vertical Support (S31) in the Brick Chamber so that it sits on the Press Plate and is next to the Tube.
# Clamp the Inner and Outer Rails along the Sides
# Clamp the Roof between the Rails at the Front side of the Drawer as shown
# Tack weld the clamped drawer at a few locations down to prevent warping when it is welded together.
# Tack weld the clamped drawer at a few locations down to prevent warping when it is welded together.
# Complete the welding joints, welding at different locations as you go to prevent warping.
# Complete the welding joints, welding at different locations as you go to prevent warping.

Revision as of 21:09, 18 August 2011

Main > Housing and construction > CEB Press > CEB press building instructions

Tools Required

Materials Required

IDQuantTypeLength Total NameDetail

Diagrams

Drawer Parts

Drawer Parts

Drawer Assembly Step 1

Assemble Drawer 1

Drawer Assembly Steps 2-4

Assemble_Drawer 2

Drawer Assembly Steps 5, 6

Steps 5 and 6

Drawer Assembly Step 7

Step 7



Fabrication Steps

(note: part numbers refer to the recently-published parts list on the Bill of Materials page)

  1. Weld the Tube (S42) on the Press Plate (S26) so that it lines up with one edge of the Press Plate and the Press Plate extends 1" beyond the other side
  2. Clamp the Sides (S29) on the ends of the tube as shown.
  3. Clamp the Back between the extended ends of the Sides (S29)
  4. Clamp the Vertical Support (S31) in the Brick Chamber so that it sits on the Press Plate and is next to the Tube.
  5. Clamp the Inner and Outer Rails along the Sides
  6. Clamp the Roof between the Rails at the Front side of the Drawer as shown
  7. Tack weld the clamped drawer at a few locations down to prevent warping when it is welded together.
  8. Complete the welding joints, welding at different locations as you go to prevent warping.
  9. Check the completed drawer to ensure that it is still straight.
  10. If they are not straight, the rails may need to be adjusted to ensure that the bearings will roll fit them correctly; if the drawer is not even and aligned, it may not fit properly in the frame.
  11. Weld the Cylinder Tongue (S23) to the centre of the Back (S22) of the Drawer.
Clamp Rails
Clamp Drawer