Steam Engine Planning: Difference between revisions
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
=Electronics= | =Electronics= | ||
*[http://www.ascovalve.com/Applications/Products/Solenoid2WayData.aspx#HotWater Asco valve] - 8 hz, 150 PSIg operating pressure solenoid steam valve - $100 new; one required | *[http://www.ascovalve.com/Applications/Products/Solenoid2WayData.aspx#HotWater Asco valve] - 8 hz, 150 PSIg operating pressure solenoid steam valve - $100 new; one required | ||
*Programmable Logic Controller - | *Programmable Logic Controller - [http://arduino.cc/en/Main/ArduinoBoardDuemilanove Arduino board]? | ||
=Materials= | =Materials= |
Revision as of 01:53, 8 December 2008
Introduction
Nick Raaum is project manager.
Strategy
On 12.6.08, Nick and Marcin had a strategy session in which we decided:
- Pursue a simple, single-acting, steam engine with electronically controlled valve
- Pursue stock pipe sections to eliminate casting requirements?
Electronics
- Asco valve - 8 hz, 150 PSIg operating pressure solenoid steam valve - $100 new; one required
- Programmable Logic Controller - Arduino board?
Materials
- A56 Schedule 80 half inch piping, carbon steel