Site Preparation Instructions: Difference between revisions
Jump to navigation
Jump to search
Margaret Ida (talk | contribs) No edit summary |
Margaret Ida (talk | contribs) |
||
Line 10: | Line 10: | ||
[[https://docs.google.com/leaf?id=1DZGHOq5_jYsO4SwlsuEU37nDyT_9pnnM3C2oKWiyMbLQwFtXj5GdIEhpIhYv&hl=en Detailed stakeout of building plan]] | [[https://docs.google.com/leaf?id=1DZGHOq5_jYsO4SwlsuEU37nDyT_9pnnM3C2oKWiyMbLQwFtXj5GdIEhpIhYv&hl=en Detailed stakeout of building plan]] | ||
Here is a drawing with dimensions for laying out site for excavation of the column pad holes. | |||
Instructions are also offered. | |||
The green lines indicate where the storm drainage ditch is planned to run. | |||
[[File:Workshop site Excavation layout.png|thumb|800 px|center]] | |||
===Preparing footings for Column Pads=== | ===Preparing footings for Column Pads=== | ||
[[https://docs.google.com/leaf?id=1IMWtpzgw8_tln1n1pxUDg1rOmf5rnL7XF1qQZ2vroV-MD2r3fk_hTvPfnjxE&hl=en Excavate and fill column pad holes]] | [[https://docs.google.com/leaf?id=1IMWtpzgw8_tln1n1pxUDg1rOmf5rnL7XF1qQZ2vroV-MD2r3fk_hTvPfnjxE&hl=en Excavate and fill column pad holes]] |
Revision as of 06:13, 22 September 2011
Preparation of staging areas and building sites gets your project moving smoothly.
STAGING AREA CONSIDERATIONS
STEPS FOR PREPARING TO BUILD
Clearing the building site
Laying out the building site
[Detailed stakeout of building plan]
Here is a drawing with dimensions for laying out site for excavation of the column pad holes. Instructions are also offered. The green lines indicate where the storm drainage ditch is planned to run.