CNCCMV2/Structure/Techniques: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 3: Line 3:
*Datum points and edges are points and edges of the workpiece that you measure from.
*Datum points and edges are points and edges of the workpiece that you measure from.


*In most cases, 2 datum edges will be used as shown in the diagram below.
*In most cases, 2 datum edges will be used. How to measure using 2 datum edges is shown in the diagram below.


[[Image: 2datumedges.gif]]
[[Image: 2datumedges.gif]]

Revision as of 22:46, 24 April 2012

Point Marking with Datum Points and Edges

  • Datum points and edges are points and edges of the workpiece that you measure from.
  • In most cases, 2 datum edges will be used. How to measure using 2 datum edges is shown in the diagram below.

2datumedges.gif

Match Drilling

  • Set 2 components one on top of the other, mount securely, then drill through both pieces at the same time for exact matching accuracy.
  • Match drilling works effectively with templates
  • Match drilling works effectively for pieces before they are cut apart