Cold Saw/Build Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
http://opensourceecology.org/wiki/Cold_Saw/Sourcing
http://opensourceecology.org/wiki/Cold_Saw/Sourcing


=Vise: Drill Fixed Block=
=Base: Drill Base Flat=
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Base_Flat
Match drill using Fixed Block
=Base: Drill Base Plate=
http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Baseplate
Match drill using Base Flat


=Vise Assembly=
=Vise Assembly=

Revision as of 00:10, 16 June 2012

Source Hardware

http://opensourceecology.org/wiki/Cold_Saw/Sourcing

Vise: Drill Fixed Block

Base: Drill Base Flat

http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Base_Flat

Match drill using Fixed Block

Base: Drill Base Plate

http://opensourceecology.org/wiki/Cold_Saw/V1_Design_Files/Baseplate

Match drill using Base Flat

Vise Assembly

  • Clamp Blocks onto Moving Blocks: Tack weld + weld the Clamp Blocks onto the Moving Blocks, then surface grind the clamping face of the Clamp Blocks such that their clamping faces are parallel. Then drill the Jaw holes through the Clamp Blocks.
  • Threaded Rod and Nuts: Position the Moving Block such that the Threaded Rod can be inserted vertically. Insert the Threaded Rod, then fasten the Nut onto the threaded rod such that the nut contacts the Moving Block. Center the nut approximately then tack weld + weld the nut onto the Moving Block.